10.0 Installation
30
© Baxi Heating UK Ltd 2011
10.2
Preparing The Boiler
1. Remove the outer carton and packaging.
2. Lift the outercase upwards and remove.
3. Remove the internal packaging.
Fig. 22a
Internal Polystyrene
Packaging Piece
Fig. 23
Break Off Upper &
Lower Pipe Run
Options
Lower Door Panel
Outercase
Supplied by HeatingSpares247.com