© Baxi Heating UK Ltd 2008
26
MINIMUM CLEARANCE
MINIMUM CLEARANCE
MINIMUM CLEARANCE
MINIMUM CLEARANCE
BOILER OUTLINE
Core Drill
Flue Hole
105mm (4")minimum
or
127mm (5")
mimimum
for Internal
Fitment Kit
BOILER OUTLINE
BOILER OUTLINE
BOILER OUTLINE
Condensate Pipe - This must be plastic and always slope
continually downwards from the boiler by at least 50 mm
in every metre (approx. 2.5˚).
No air breaks are required in the condensate pipe.
For the boiler to operate correctly all air must
be vented from the system prior to
commissioning and the system itself must
be suitably vented.
The dimensions shown ensure the flue is
installed with the correct rise of 53 mm
in every metre (approx. 3˚) from the boiler.
Boiler
Termination via internal discharge
branch e.g. sink waste - downstream
Sink
Pipe must terminate above
water level but below
surrounding surface
Termination to a purpose made soak-away
Boiler
Holes in the soak-away
must face away from
the building
500mm Min
Boiler
Termination to a drain or gully
Pipe must terminate
above water level but
below surrounding
surface
Key Installation Points - Refer to the Installation & Service and/or Flue Kit Instructions for more information.
Boiler
450mm Min
Termination to an internal soil
and vent pipe
Centre Line
Condensate
Centre Line
Gas
Centre Point
Gas
connection
Centre Line
Flow
Centre Line
Return
275 mm
Front Clearance
15 mm
Operational
clearance
and
610 mm
Servicing
clearance
'B'
'A'
Dimension 'A'
centre of flue
elbow to inside
of wall
100 mm
500 mm
1000 mm
1500 mm
2000 mm
2500 mm
3000 mm
3500 mm
Dimension 'B'
vertical
offeset required
5 mm
27 mm
53 mm
79 mm
105 mm
131 mm
158 mm
184 mm
Cut with
3
°
Rise
STAND OFF KIT-
Top Mounting Points
STAND OFF KIT-
Bottom Mounting Points
!
!
!
!
BOILER SECURING POINT
Drill and plug - 7 mm
Secure using woodscrew supplied
or optional Anti-theft kit
WALL MOUNTING BRACKET
Drill and plug - 7 mm
Secure using woodscrews supplied
50mm pe
r metre (2
.5˚)
Minimum
Fall
Boiler Mounting Bracket
Boiler Mounting
Bracket
Woodscrews
Boiler Securing Point
Woodscrew
or
Anti-theft kit
Lifting points
in base of packing
Fig. 33
4. Installation
4.1
Unpack & Prepare the Wall & Boiler
These instructions assume you have chosen a
suitable boiler location which will also allow
correct installation of the condensate and flue
systems.
1. Carefully unpack the boiler,
leave the
packing around the base of the boiler
fitted
. Do not discard other packaging until
all the items are accounted for and/or the
boiler is installed.
2. Place the mounting template in the proposed
boiler position ensuring that it is level.
Minimum clearances, fixing points,
pipework centrelines and flue incline are
all accounted for on the template
.
3. Mark the flue hole, mounting bracket fixing
positions (two), boiler securing point and
pipework centre lines then remove the
template.
4. Drill (7 mm drill) and plug the three mounting
holes.
Drill (on an incline, approx. at least 1.5° to
ensure the condensate drains back to the
boiler) a 105mm diameter hole for the flue
through the wall or a 127mm diameter hole if
the Internal Fitment Kit is being used.
5. Secure the mounting bracket to the wall
using two No. 12 x 2" woodscrews
(supplied).
6. Lift the boiler
by the packing at the base
onto the mounting bracket.
7. Remove the packing from the base and
square boiler to the wall using the alignment
screws on the back panel. Pull the door panel
down and remove the two securing screws.
Slide off the controls cover assembly and put
safely aside.
8.
Ensure the boiler is secured to the wall
(using the third No. 12 x 2" woodscrew)
through the hole in the bracket at the rear of
the boiler case.
Note:
The anti-theft securing kit (Part No.
238035POT) may be used in place of the
third woodscrew if required.
Содержание Performa 12 SL HE
Страница 65: ...6 0 Notes 9 Baxi Heating UK Ltd 2008 ...
Страница 66: ...6 0 Notes 10 Baxi Heating UK Ltd 2008 ...