NOTE:
6.6, 6.7 & 6.8 to be measured in secondary flue 600mm
up from the flue socket or at the sampling point provided.
Normally 6.13 and 6.15 are recorded when tapings provided.
Position of measurement to be in accordance with boiler and/or
burner manufacturers instructions.
10.0
NOTES & COMMENTS BY COMMISSIONING
ENGINEER
FINDINGS
YES
NO
Is The Installation Safe For Use?
If The Answer Is NO Has A Warning Label Been
Raised?
Is Any Remedial Work Required?
Have Warning Labels Been Fitted?
Has RIDDOR Form Been Raised?
CUSTOMER SIGNATURE:-
PRINT NAME:-
DATE:-
ENGINEER DETAILS
NAME
COMPANY
SIGNATURE DATE
Flue Type & Diameter Of Connection To Boiler:-
TYPE…………………………../DIAMETER(mm)……………..
Where appropriate and for multi boiler installations sketch.
details of flue system showing length of runs and diameter
Conventional
Fan Assisted
Flue Dilution
8.13
Approximate Overall Height………………………………m
YES
NO
8.14
Is The Fan Interlocked With The Boiler?
8.15
Are Flue Dampers Fitted?
If So Are They Interlocked?
8.17
Any Evidence Of Condensate Formation?
8.18
Any Evidence Of Water Leakage?
8.19
Any Evidence Of Flue Gas Leakage?
8.20
Has Boiler Been Built And Cased Correctly?
8.21*
Is Gas Service Cock Installed?
If So Is It Accessible?
8.22
$
Is Oil Filter Fitted?
8.23
$
Is Fire Valve Fitted?
Single Pipe
Two Pipe
8.24
$
Oil Supply:
Ring Main
9.0
REPAIRS CARRIED OUT
COMMISSIONING REPORT (Continued)
Baxi Heating (uk) Ltd. Registered Office:
Sir Frank Whittle Road, Derby DE21 4XA
Registered in England No. 3879156
PCF No. 208/03
NOTE
: It is the installer’s responsibility to ensure that the boiler is correctly commissioned by a competent engineer and that this report is completed
and kept as a record. A commissioning service available from Potterton at the address listed on the back page of this manual. When a Potterton
engineer commissions, this completed report will be sent to the installer. It is the installer’s responsibility to action any points arising.
Commissioning by Potterton engineers is restricted to equipment of our supply. No responsibility is accepted for the on site assembly or installation
of the equipment unless specifically carried out by Potterton. The installer must ensure that the boiler is installed in accordance with the
manufacturers instructions and all relevant BS Codes of Practice and Regulations (see manufacturer’s instructions for full details). Items 4.1 to 4.6
are related to the boiler installation and as such these pre-commissioning checks should be carried out in the presence of the installer.