Potterton Gold Combi 24 Скачать руководство пользователя страница 9

6.0 Legislation

9

© Baxi Heating UK Ltd 2015

6.1

Installation, Commissioning, Service & Repair

1. This appliance must be install in accordance with the
manufacturer’s instructions and the regulations in force. Read
the instructions fully before installing or using the appliance.

2. In GB, this must be carried out by a competent person as
stated in the Gas Safety (Installation & Use) Regulations.

3. 

Definition of competence:

A person who works for a Gas

Safe registered company and holding current certificates in the
relevant ACS modules, is deemed competent.

4. In IE (Eire), this must be carried out by a competent person
as stated in I.S. 813 “Domestic Gas Installations”.

All Gas Safe registered engineers carry an ID card with their
licence number and a photograph. You can check your
engineer is registered by telephoning 0800 408 5500 or online
at www.gassaferegister.co.uk

The boiler meets the requirements of Statutory Instrument
“The Boiler (Efficiency) Regulations 1993 No 3083” and is
deemed to meet the requirements of Directive 92/42/EEC on
the energy efficiency requirements for new hot water boilers
fired with liquid or gaseous fuels:-

Type test for purpose of Regulation 5 certified by:
Notified Body 0085.

Product/Production certified by:
Notified Bodies 0086.

For GB/IE only.

6.2 

Benchmark Commissioning Checklist

1. Please ensure that the installer has fully completed the
Benchmark Checklist on the inside back pages of the
installation instructions supplied with the product and that you
have signed it to say that you have received a full and clear
explanation of its operation. The installer is legally required to
complete a commissioning checklist as a means of complying
with the appropriate Building Regulations (England and Wales).

2. All installations must be notified to Local Area Building
Control either directly or through a Competent Persons
Scheme. A Building Regulations Compliance Certificate will
then be issued to the customer who should, on receipt, write
the Notification Number on the Benchmark Checklist.

3. This product should be serviced regularly to optimise its
safety, efficiency and performance. The service engineer should
complete the relevant Service Record on the Benchmark
Checklist after each service.

4. The completed Benchmark Checklist may be required in the
event of any warranty work.

Содержание Gold Combi 24

Страница 1: ...Gold Combi User Guide Condensing Combination Boiler 24 28 33 en United Kingdom Please keep these instructions in a safe place If you move house please hand them over to the next occupier ...

Страница 2: ...e liable to criminal prosecution and civil claims for damages 1 0 Quick Reference Guide 3 2 0 Troubleshooting 4 3 0 Repressurising System 6 4 0 Clearances 7 5 0 Care of the Boiler 8 6 0 Legislation 9 7 0 Setting the Timer 10 8 0 Warranty Service 11 9 0 ErP Information 13 10 0 Emergency 17 11 0 Disposal 17 12 0 Notes 18 Section Page Contents Boiler Controls see opposite page for Operating Quick Ref...

Страница 3: ...mestic Hot Water Indicator The indicator will illuminate when hot water is being supplied to a tap or shower Burner On Indicator The indicator will illuminate when the burner has fired and is heating your central heating or domestic hot water Boiler Output Temperature In either the central heating or domestic hot water position the display will illuminate showing the current boiler temperature in ...

Страница 4: ... on Reset Display Central Heating Indicator Domestic Hot Water Indicator Burner On Indicator Boiler operating satisfactorily bar 0 1 2 3 4 Is the Central Heating System Pressure needle in the GREEN section between 1 and 2 5 bar If the reading falls below 1 bar repressurise the system as described in section 3 1 Does the display show an error code e g E133 E110 Boiler not working NO NO YES YES YES ...

Страница 5: ...oom Thermostat if fitted set high enough 15 10 5 20 2 5 15 10 5 20 2 5 Turn Room Thermostat to maximum setting typical example shown If you don t know what you need to do to get the boiler to light or need help with the system and controls contact your installer as soon as possible YES NO CONTACTYOUR INSTALLER OR SERVICE ENGINEER YES 1 2 3 4 5 P M 7 8 9 1 0 1 1 1 2 1 2 3 4 5 A M 7 8 9 1 0 11 12 0 ...

Страница 6: ... re pressurising a fault or leak is indicated see section 3 1 Seek advice from your installer 3 The filling loop supplied with the boiler consists of two blue handled isolating taps and a separate temporary filling pipe with connection fittings Fig 3b 4 Looking underneath the right hand side of the boiler ensure the two blue handled isolating taps are in the OFF position Remove the Blanking Caps F...

Страница 7: ... casing correctly fitted 4 Do not interfere with any sealed components on this boiler 5 Take note of any warning labels on your boiler 6 Your boiler should have the following minimum clearances for Safety and Maintenance Fig 4 Top 175mm Bottom 150mm Left side 5mm Right Side 5mm Front 5mm In Operation 450mm For Servicing This is the MINIMUM recommended dimension Greater clearance than this will aid...

Страница 8: ...code and contact your installer or service engineer E28 may also indicate a blocked flue or condensate drain 4 If E110 or E130 is displayed overheat of the primary water or flue system has occurred Turn the selector switch to the reset position and hold for at least 5 seconds If the boiler does not relight or the code is displayed regularly contact your installer or service engineer 5 E119 is disp...

Страница 9: ...y requirements for new hot water boilers fired with liquid or gaseous fuels Type test for purpose of Regulation 5 certified by Notified Body 0085 Product Production certified by Notified Bodies 0086 For GB IE only 6 2 Benchmark Commissioning Checklist 1 Please ensure that the installer has fully completed the Benchmark Checklist on the inside back pages of the installation instructions supplied wi...

Страница 10: ...e on demand To set the time of day Turn the timer outer bezel clockwise to align the pointer with the correct time to the nearest 15 minutes ensuring that A M P M is considered Do not at any time attempt to turn the bezel anti clockwise To set the timed heating program Decide which times of the day the central heating is required The heating will operate when the white tappets are set to the outer...

Страница 11: ...ur installer and records that the boiler has been installed and commissioned correctly It can be found at the back of the installation and service manual and should be kept in a safe place for the life of the boiler We will check that the Benchmark Checklist has been completed on an in warranty visit Ways to register your warranty If your boiler is eligible for an extended warranty your installer ...

Страница 12: ...am of Gas Safe registered engineers to visit If your product is in warranty everything is free of charge subject to our warranty terms and conditions If it is out of warranty we can still help and offer a range of options you can choose from to suit your needs Contact Baxi Customer Support 0344 871 1525 Opening hours Monday Friday 8 00am 6 00pm Weekends and Bank Holidays 8 30am 2 00pm Please note ...

Страница 13: ...ting energy efficiency class A A A A Rated heat output Prated or Psup kW Space heating Annual energy consumption kWh GJ Water heating Annual energy consumption kWh GJ Seasonal space heating energy efficiency Water heating energy efficiency Sound power level LWA indoors dB See For specific precautions about assembling installing and maintaining consult the relevant section as detailed on the Conten...

Страница 14: ... a k c a p f o s s a l c y c n e i c fi f e y g r e n e g n i t a e h e c a p s l a n o s a e S e g a k c a p f o y c n e i c fi f e y g r e n e g n i t a e h e c a p s l a n o s a e S R O n i y c n e i c fi f e y g r e n e g n i t a e h e c a p s l a n o s a e S p m u p t a e h y r a t n e m e l p p u S g n i t a r k n a T n i y c n e i c fi f e r o t c e l l o C m n i e m u l o v k n a T m n i e z...

Страница 15: ...l expression 115 11 ʷ Prated whereby Prated is related to the preferential space heater Weighting of boilers 0 0 0 0 1 0 3 0 37 0 2 0 55 0 70 0 3 0 75 0 85 0 4 0 85 0 94 0 5 0 95 0 98 0 6 0 98 1 00 0 7 1 00 1 00 1 The intermediate values are calculated by linear interpolation between the two adjacent values 2 Prated is related to the preferential space heater or combination heater III IV I V Psup ...

Страница 16: ... c e g a r e v a r e d n u e g a k c a p f o y c n e i c fi f e y g r e n e g n i t a e h r e t a W y t i c i r t c e l e y r a i l i x u A n o i t u b i r t n o c r a l o S r e t a e h n o i t a n i b m o c f o y c n e i c fi f e y g r e n e g n i t a e h r e t a W e c i v e d r a l o s f o e h c fi m o r f r e d l o C r e m r a W s n o i t i d n o c e t a m i l c r e m r a w d n a r e d l o c r e...

Страница 17: ... or Service Engineer as soon as possible If you smell gas Do not operate light switches Do not operate any electrical equipment Do not use a telephone in the hazardous area Extinguish any naked flame and do not smoke Open windows and doors in the hazardous area Turn off the gas supply at the meter Warn any other occupants and vacate the premises Telephone the National Gas Emergency Service on 0800...

Страница 18: ...18 Baxi Heating UK Ltd 2015 12 0 Notes ...

Страница 19: ...12 0 Notes 19 Baxi Heating UK Ltd 2015 ...

Страница 20: ...erms and conditions visit www baxi co uk terms Failure to adhere to terms and conditions will void your manufacturer s warranty Baxi Brooks House Coventry Road Warwick CV34 4LL Please ensure the boiler is installed in accordance with these installation instructions and that you adhere to the Building Regulations e oe All descriptions and illustrations provided in this document have been carefully ...

Отзывы: