10.0 Installation
33
© Baxi Heating UK Ltd 2009
10.7
Fitting the Flue
(Cont)
6. Ensure the inner flue support bracket is positioned in
the flue (Fig. 28).
7. Engage the flue into the flue elbow using soap solution
to ease the engagement ensuring the flue is assembled as
shown (Fig. 29).
8. Place the gasket over the flue exit on the boiler.
9. Slide the flue assembly through the hole in the wall.
10. Engage the elbow on to the flue connection on top
of the boiler. Secure with the four screws supplied in the
kit.
11. Make good between the wall and air duct outside the
building ensuring at least a 1.5° drop between the
terminal and elbow.
12. The flue trim should be fitted once the installation is
complete and the flue secure (Fig. 30). Apply a suitable
mastic to the inside of the trim and press against the wall
finish, making sure the brickwork is dust free and dry.
13. If necessary fit a terminal guard (see Section 7.9).
VERTICAL FLUEING
1. Only a flue approved with the Potterton Promax HE
Plus range can be used.
Gasket
Flue Trim
Inner Flue Support Bracket
Flue
Flue Elbow
Fig. 28
Fig. 30
Fig. 29
Apply Lubricant for ease of
assembly. Ensure Flue is fully
engaged into Flue Elbow
Содержание 15 HE Plus
Страница 56: ...18 0 Notes 56 Baxi Heating UK Ltd 2009 ...
Страница 57: ...18 0 Notes 57 Baxi Heating UK Ltd 2009 ...