![Potter NGP-300D Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/potter/ngp-300d/ngp-300d_installation-operation-and-service-manual_1582917013.webp)
13
Manual: NGP-300D
7. Installation of Nitrogen Purging System
Each riser requires a minimum of ONE Nitrogen Purge Valve to be installed prior to implementing the
Nitrogen Purging Procedure.
For installation instructions, refer to the Model NGP-SPV Bulletin (#5401520) or Model INS-PV Manual (#5401532) supplied
with each purge valve.
NGP-SPV
(Potter Purge Valve #1119784)
INS-PV
(Potter IntelliPurge Nitrogen Purge Valve #1119478)
Purge Valves must be installed in a level horizontal position (shown above).
firealarmresources.com
Содержание NGP-300D
Страница 2: ...2 Manual NGP 300D firealarmresources com...