background image

3

TO

PA

LYI

N

G SURFACE

1

3

10

'-

0

"

5

6

7

4

6

7

2

Detail "C"

7.

The crossbar is assembled between the uprights with 
two tee castings, one 1/2" x 3-1/2" lg. hex head cap 
screw, one 1/2" x 5" lg. hex head cap screw, two 1/2" 
lock washers, and two 1/2" hex nuts at each 
connection.  The TOP of the crossbar must be 
located exactly 10'-0" above the playing surface.  
After the crossbar is properly located, securely tighten 
the hardware at both ends.  See Detail “C”. 

8.

Installation of the football goal posts is now complete. 

Отзывы: