
PIWIS Tester III (PT3)
32
7.5.1
Resistance measurement
Resistance measurement is only performed using channel 1. Channels 2, 3 and 4
are not intended for measuring resistance. At the start of the resistance measurement,
channel 1 must be connected and calibration must be performed at resistance values
of < 10
Ω
. The probes must then be connected together before pressing the F9
‚Takeover‛ button.
Display before calibration
9_70_16
Resistance measurement ready
9_71_16
Live resistance measurements result in the
automatic switch-off of the ohmmeter for
safety reasons. The cause can be corrected
and the measurement can be resumed by
confirming the switch-off dialogue box.
Takeover button
9_69_16
Takeover
Null measurement
Offset
Please note that the component which is to be assessed must be disconnected
and that all cable connections which might affect the measurement must be
removed prior to each resistance measurement.
Perform a zero-balance to receive a straight resistance measurement.
Connect probes and press Next button.
Digital multimeter
Содержание PIWIS Tester III
Страница 1: ...FRONTCOVER PIWIS Tester III PT3 Service Training...
Страница 6: ......
Страница 100: ...PIWIS Tester III PT3 94 11 3 14 Notes...
Страница 101: ...CHAPTER1 PIWIS Tester III PT3 95...
Страница 103: ...BACKCOVER...