39
Operating Manual
DE
EN
FR
IT
ES
PT
NL
SV
FI
DA
NO
EL
CZ
HU
PL
HR
SR
SK
SL
ET
LT
LV
RO
BG
MK
f
Refer to chapter “Activating ground monitoring”
on page 39.
Deactivating ground monitoring
Fig. 11: Key sequence for deactivating ground monitoring
b
The
CHARGE
STATUS
button lights up red.
b
The
DOMESTIC
indicator light and the
VEHICLE
indicator light light up red.
b
Ground monitoring
has interrupted the charging
process or prevents it from starting.
1.
Press and hold the
CHARGE
STATUS
button
and
MULTI
-
FUNCTION
BUTTON
simultaneously.
The
CHARGER
indicator light flashes white when
you do so.
2.
As soon as the
CHARGER
indicator light stops
flashing, release both buttons.
3.
After 2 seconds (count the time as soon as the
flashing stops), press and hold both buttons
again simultaneously for at least 5 seconds.
The
CHARGER
indicator light flashes white when
you do so.
Ground monitoring is deactivated when the
DOMESTIC
CONNECTION
indicator light and the
VEHICLE
indicator light light up yellow. During
charging, the
CHARGE
STATUS
button additionally
pulses green.
Monitoring remains deactivated for subsequent
charging processes.
Activating ground monitoring
If the charger is operated in an earthed mains supply
system, activate
ground monitoring
.
e
Press and hold the
CHARGE
STATUS
button and
the
MULTI
-
FUNCTION
BUTTON
simultaneously for
at least 5 seconds.
The
CHARGER
indicator light flashes white when
you do so.
Ground monitoring can be activated via the web
application:
f
For information on the web application, see the
manual at https://www.porsche.com/interna-
tional/aboutporsche/e-performance/help-and-
contact/
If you require a different language, please select
the appropriate website for your country.
Energy Manager
The energy manager coordinates the energy
consumers and energy suppliers in the household.
For charging control to be assumed by the energy
manager, the charger and energy manager must be
connected to one another via a Powerline Communi-
cation (PLC) network connection. For this purpose,
the existing mains supply is used to set up a local
network for data transfer.
Adding the energy manager
There are two options for connecting the energy
manager to a PLC network:
– The energy manager is registered as a client in
a PLC network (application variant 3).
– Direct PLC communication between the charger
and energy manager (DHCP server) (application
variant 4)
f
For information on application variants, refer to
chapter "Possible Uses" on page 31.
The connection between the charger and energy
manager is established directly from the charger and
in the web application of the energy manager.
Establishing a Connection to the
Charger
The
ENERGY
MANAGER
indicator light shows the
status of the connection to the PLC network and to
the energy manager.
PLC/energy manager connection status indicator
Information
For easier operation of the charger, your fingers
should cover the buttons completely and apply even
pressure.
Status
indicator
Meaning
Pulsing yellow
Status 1
The charger attempts to re-estab-
lish the previously used PLC
connection (maximum duration:
60 seconds).
e
Optional
:
Press and hold
the
MULTI
-
FUNCTION
BUTTON
for 3 seconds to skip re-
connection.
The charger then searches for
a new PLC network.
Flashing
yellow
Status 2
The charger attempts to establish
a connection to the new PLC
network (maximum duration:
9 minutes).