Porcher ARCHIVE 60745 Скачать руководство пользователя страница 12

12

754550-100 Rev. B

REMOTE BLOWER LOCATION OPTION 

IMPORTANT!  

It is not necessary that the blower motor be relocated. This option is provided for the case that a particular 

 

installation makes this effort practical. 

 

NOTE:

 

Relocating blower motor from factory installed location, see photo 

1

, will require disassembly of air blower from mounting 

 

board. Keep all hardware for reattachment at new location. Additional hardware will be required depending upon final 

 

desired position of air blower. Follow all instructions listed below. 

NOTE:

  Installing the blower in a remote location will reduce the system efficiency. 

NOTE:

  Relocating a blower motor still requires a service access for the blower. 

NOTE:

  All materials needed for the relocation must be supplied by the installer. This includes ordering a longer control panel 

 

cable (754025-0073A), a longer flexible blower hose (753960-2030A), and up to two lighting cable extensions for combo 

 models 

(754512-0070A). 

A separate circuit, which must be protected by the Ground Fault Circuit Interrupter (GFCI), is required in the remote location. 
Electrical connections should be performed by a licensed electrician. 

The blower motor must be located within 12 feet of rigid piping from the bath air manifold. This limitation is for the total pipe length 
and applies to any direction changes and elbows. There can be no more than six changes of direction. There should be as few 
direction changes as possible and the piping installation must meet all requirements of local plumbing and building codes. 

Disconnect the blower from the flexible hose as shown in photo 

2

. Do NOT remove the check valve manifold that is mounted to the 

underside of the air bath. The manifold MUST remain mounted above the tub overflow level as shown in 

2

.

Replace the flexible hose shown in photo 2 with the longer flexible hose (P/N 753960-2030A) using the existing hope clamps.

NOTE: 

Do 

NOT

 remove the original cable coming out of the blower. Instead, plug the longer cable (P/N 754025-0073A) 

 

into the existing cable that is coming out of the blower as shown in photo 3. Then plug the remaining end of the 

 

longer cable into the control panel which remains on the tub wall.

1.

TYPICAL VIEW

2.

TYPICAL VIEW

Do 

NOT

 move check 

valve manifold

3.

TO CONTROL PANEL

754025-0073A CABLE

(INCLUDES ADAPTER 

BOX SHOWN)

TO BLOWER

EXISTING 

CABLE

Содержание ARCHIVE 60745

Страница 1: ...sage System To ensure maximum performance and pleasure from this product please follow the instructions and cautions Porcher 2010 All product names listed herein are trademarks of Porcher unless other...

Страница 2: ...ructions Page 9 Under Deck Mounting Instructions Page 10 Electrical Instructions Page 11 Remote Air Blower Location Option Page 12 Free Standing Tubs Page 13 14 Drain Assembly and Installation Instruc...

Страница 3: ...void alcohol consumption before or during bathing Alcoholic beverages can cause drowsiness or hyperthermia resulting in loss of consciousness or even drowning WARNING Pregnancy If you are or think you...

Страница 4: ...age however they are not warranted against leaks when improperly used or subjected to conditions for which they are not designed 4 Plug the blower into a 110V GFCI outlet Start the blower and check al...

Страница 5: ...ional Components not included Level Nails Tile Bead Kits P N 751755 100 Tape Measure Putty Pipe Wrench Caulking waterproof Required Components Slip Joint Pliers 1 X 4 Stringers Drain included Screw Dr...

Страница 6: ...b 63 1 2 1613mm Cut Hole Length 9 1 2 241mm Center of Drain 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 14 356mm 14 356mm 1 3 4 44mm 7 1 4 190mm 7 1 4 19...

Страница 7: ...7mm 19 1 2 495mm 18 3 4 476mm 16 406mm 21 533mm 18 457mm 3 76mm 55 1397mm 115 95 Tetsu 5 1 2 x 36 1676 x 914mm Model 60545 For Air Baths Add 2 1 2 64mm For Air Baths Add 2 1 2 64mm For Air Baths Add 2...

Страница 8: ...waste and overflow assembly is concealed between the walls of the tub eliminating the need for a decorative exposed drain kit Dotted Line Represents Bathing Well Measurements are 13mm and are subject...

Страница 9: ...r the drain See the roughing in drawing for suggested opening size shadowed and location dimensions The drain overflow of the bath extends below the bottom of the bath Note that this requires a cutout...

Страница 10: ...ng 3 Cut bath deck to your specifications A professional solid surface installer should template product on site for exact cut out dimension 4 Replace the bath deck and secure it into place 5 Apply ad...

Страница 11: ...TRIC SHOCK Connect only to a circuit protected by a ground fault circuit interrupter 2 Permit access for servicing blower if equipped as noted 3 All building materials and wiring should be routed away...

Страница 12: ...location Electrical connections should be performed by a licensed electrician The blower motor must be located within 12 feet of rigid piping from the bath air manifold This limitation is for the tot...

Страница 13: ...y special attention to the spout reach when choosing your fixtures Be careful to ensure the spout will extend out far enough to clear the tub flange and the falling water will not hit too high up on t...

Страница 14: ...nter of the room Keep in mind that the placement of the blower can be challenging or problematic All models have a built in access panel for drain installation that you may prefer to place on the less...

Страница 15: ...e overflow Recheck the couplings and make certain that they are not leaking Although the couplings are factory tightened and inspected some loosening may have occurred during transit Make sure the air...

Страница 16: ...rain from below unit through opening as shown in photo A 5 Apply 3 or 4 pea sized dabs of 100 silicone sealant to bottom waste drain flange and press flat rubber gasket into place as shown in photos B...

Страница 17: ...acrylic surface as directed by silicone sealant directions 9 From unit back side overflow nut should be in alignment with overflow opening as shown in photo F 10 Slide air bath fitting nut washer and...

Страница 18: ...in overflow assembly pipe per photo O 16 Apply PVC cement to barbed end of 90 degree elbow and insert vertical flex hose over barbs as shown in photo P 17 Align vertical flex hose end of piping with t...

Страница 19: ...drain waste hole as shown in photo V 23 The drain stopper should prevent water from draining out of tub when the escutcheon is in the fully counterclockwise position as shown in photo W Adjust the dra...

Страница 20: ...infectant spray or concentrate or Lysol Basin Tub and Tile Cleaner Windex Mr Clean Dow Disinfectant Bathroom Cleaner or cleaning products in aerosol cans HARSH CHEMICALS SHOULD NEVER BE USED ON ACRYLI...

Страница 21: ...ERATING CHROMATHERAPY DISPLAY COLORS 1ST 2ND 3RD 4TH 5TH 6TH 7TH 8TH 9TH 10TH 11TH WHITE SLOW RAINBOW CYCLE FAST RAINBOW CYCLE TURQUOISE BLUE MAGENTA RED ORANGE YELLOW GREEN RETURN TO SLOW RAINBOW CYC...

Страница 22: ...rted with a state of the art self cleaning system and enhanced it with Ever Clean The EverClean antimicrobial system incorporates AlphaSan a patented antimicrobial agent manufactured right into the ai...

Страница 23: ...e wave function button will light Blower speed will continuously vary between high and low Press again to exit wave function button light will go out STANDARD DRYING CYCLE An automatic drying cycle wi...

Страница 24: ...To turn on Chromatherapy lights press light button once The cycle will start on white Turn off and on within 3 seconds it will change to slow rainbow cycle and so on per the display color table shown...

Страница 25: ...e 24H PRO PROGRAMMABLE DRYING CYCLE The system must be stopped prior to activation or deactivation Activation Determine at which time you wish the purge to activate At that precise time press and hold...

Страница 26: ...Cleaner Windex Cleaner Mr Clean Cleaner Dow Disinfectant Bathroom Cleaner or other cleaning products in aerosol cans HARSH CHEMICALS SHARP AND ABRASIVE OBJECTS SHOULD NEVER BE USED ON ACRYLIC SURFACES...

Страница 27: ...n the owner s manual and use of other than genuine Porcher replacement parts in all cases whether caused by a plumbing contractor service company the owner or any other person 2 Deterioration through...

Отзывы: