POP UP EIGER 250 Скачать руководство пользователя страница 2

SAFETY 

CONT.

Only carry tools and materials with you when ascending or descending the tower if 
they are safely retained in a tool belt and do not restrict your free movement. Tools 
/ materials may be hoisted to the deck via a rope. PROPERLY ASSESS THE RISK 
METHOD!
Do not lean from the tower and never apply undue side force. Maximum permitted 
side load must not exceed 20Kg (200N). Never use boxes, steps or similar items 
to gain additional height. Do not stand on the toeboards, horizontal or diagonal 
braces. Always use the towers built in ladders to access platforms and climb from 
inside the tower NEVER from outside. When climbing, always keep your feet in the 
middle of the rungs and grip the upper rungs with your hands NEVER the sides.
When winds exceed Beaufort force 4, cease to use the tower. Always be aware that 
using the tower in situations such as unclad or open ended buildings or on the 
corners of buildings could cause additional wind loading of the tower structure.

Wind Speeds

Force

Peak 

MPH

Peak 

KPH

Guidance

4
6
8

18
31

46

29
50
74

Moderate breeze - raises dust and loose paper

PREPARATION

Check the ground upon which the tower is to be used is capable of supporting the 
combined weight of the tower and any necessary loading. The ground should be 
level and any slope should be within the scope of the adjustable legs. Ensure all 
tools and equipment required to erect the tower are available and on site.
Check each component for condition and correct operation BEFORE you start 
assembling the tower. Any faulty or damaged items MUST be replaced before 
assembling the tower. As you inspect each part, segregate types to make the task 
easier.

COMPONENTS

BRACES

oks at both ends. 

The triggers, when operated, pull back to allow the hook to be placed over the 
tubing used on the tower. Horizontal braces are also used as guardrails.

s) must be attached 

to the top of frame horizontal tube. Always double check that each hook is 
positively locked onto the tubing before using the tower.
The brace hook trigger mechanisms are colour coded to show which are horizontal 
braces and which are diagonal braces. Horizontal brace triggers are coloured red 
and diagonal brace triggers are coloured blue.

TYING IN

Please refer to PASMA guide ‘Tying in Mobile Towers’ available for download at 
http://pasma.org.uk/shop or contact PASMA for a hard copy. tel. 0845 230 4041

DISMANTLING THE TOWER

Dismantle the tower by reversing the erection sequence. You MUST always be 
protected by a full set of guardrails when standing on a platform and removing 
components.

EQUIPMENT MAINTENANCE & CLEANING

Keep all components clean and free from contaminants. If any part becomes 
contaminated with paint, acid, oils or similar products the tower must not be used 

.

TRANSPORTATION & STORAGE

All components should be stored in a dry location where they will be protected 
from adverse weather conditions. When storing or transporting, keep frames 

ress damage.

INSTRUCTION LEAFLET AVAILABILITY

Keep these instructions in a safe place and ensure that they are made available to 
anyone using, constructing or dismantling the tower. If these instructions become 
lost or illegible, replacements should be acquired from the manufacturer.

DAMAGED COMPONENTS

Damaged components found during inspection must be quarantined until assessed 

ents.

DO NOT use damaged components in the tower structure.

BALLAST

Where shown in the component list, ballast must be used to stabilise against 
overturning. Only use solid materials as ballast (i.e. no loose materials) and position 
to avoid overloading individual components. Ballast should be supported by the base 
of the tower and securely fastened to prevent removal.

ADVANCED GUARDRAIL (AGR) PANELS

This method of construction reduces the risk of a fall from height. You will complete 
an ‘assembly / access’ platform level from which is added the ‘next lift’ of frames, AGR 

er is achieved.

be protected by a set 

of guardrails. Attaching the AGR panels from an assembly platform level provides the 
erector with a set of guardrails for the next lift of the tower. In this way the erector is 
protected from a fall in advance to accessing the next assembly platform or working 
platform.

Engaged

Disengaged

Easy-Clip Frame Clips

The Easy-Clip frame clip’s pin locates into 

a retaining hole in the frames to lock 

tower sections together when placed one 

on top of the other. The pin is locked in 

place by a red tab to ensure that it 

remains in place. From the disengaged 

position, pivot the pin/tab to bring the pin 

horizontal. Insert the pin fully through the 

retaining hole with its tail pointing down. 

Next

 fli

p the tab vertically to lock the pin 

in place.Removal is simply a reversal of 

the 

tting sequence.

Easy-Lock Stabiliser

The Easy-Lock clamps are used to secure 

the stabilisers to MiSTAIRS’s vertical 

tubing. With the clamp jaw open, o

er it 

to the tube. Bring the jaw around the 

tube and set the buckle on to the hook, 

then close the black clamp arm to lock 

the stabiliser in position. A similar clamp 

is fi

tted to the stabiliser extension leg.

Wind-Lock Catch

The Wind-Lock catch is a drop down jaw 

fitt

ed to the side of the hatch platform’s 

mounting hook and prevents the platform 

from lifting in windy conditions. It is 

attached to the horizontal tube of the 

frame. To disengage, simply lift and hold 

the jaw as you raise the platform clear.

ADVANCE GUARDRAIL PANELS (AGR) 

The AGR panels consist of both horizontal bracing and diagonal bracing members in 
a panel which can be attached to the tower from a safe guarded position.The 
horizontal bracing elements within the panel also act as a set of ‘integral’ guardrails 
an as such provides automatic guarding in advance to accessing the next level or lift 
of tower.The panels are attached by means of the same type of triggered hook as the 
horizontal and diagonal braces. The triggered hooks are found at the base of the 
panel and another pair of hooks can be found at the top of the panel. However these 
hooks are not triggered and are simply placed over the horizontal frame tubes. The 
triggered hooks at the base are used to positively lock the panel in position. Place the 
upper hooks over the horizontal frame tube 2m above the assembly platform and 
then ‘snap the triggered hooks onto the lower horizontal frame tubes.