7.29
FINAL DRIVE
7
9923523 - 2012
RANGER
RZR 570 Service Manual
© Copyright 2011 Polaris Sales Inc.
Bearing Carrier Installation
1. Install d rive sha ft a xle thr ough the ba ckside of the
bearing carrier. Be sure bushings and pivot tubes are
installed.
2. Install the fasteners that attach the rear bearing carrier
to the upper and lower A-arms. Torque NEW nuts to
specification.
3. Apply grease to drive shaft axle splines.
4. Install rear wheel hub assembly, cone washers, and
hand t ighten th e castle n ut. Install w ashers wit h
domed side out.
5. Install
new
brake caliper mounting bolts and torque to
44 ft. lbs. (60 Nm)
.
=
T
Upper and Lower Rear Bearing Carrier Nuts:
40 ft. lbs. (54 Nm)
=
T
Rear Caliper Mounting Bolts:
44 ft. lbs. (60 Nm)
CAUTION
New bolts have a pre-applied locking agent
which is destroyed upon removal. Always use
new brake caliper mounting bolts
upon assembly.
Out
Cone Washers
Wheel
Hub
44 ft. lbs.
60 (Nm)
Содержание 2012 RANGER RZR 570
Страница 4: ......
Страница 140: ...NOTES ENGINE COOLING SYSTEM 3 88 9923523 2012 RANGER RZR 570 Service Manual Copyright 2011 Polaris Sales Inc...
Страница 188: ...NOTES ELECTRONIC FUEL INJECTION 4 48 9923523 2012 RANGER RZR 570 Service Manual Copyright 2011 Polaris Sales Inc...
Страница 330: ...NOTES TRANSMISSION 8 48 9923523 2012 RANGER RZR 570 Service Manual Copyright 2011 Polaris Sales Inc...
Страница 396: ...10 36 ELECTRICAL 9923523 2012 RANGER RZR 570 Service Manual Copyright 2011 Polaris Sales Inc Cooling Fan...
Страница 398: ...10 38 ELECTRICAL 9923523 2012 RANGER RZR 570 Service Manual Copyright 2011 Polaris Sales Inc Lights...