Polanik DC-250 Скачать руководство пользователя страница 4

 

Instruction manual 

DC-250  

 

4/5 

 

According to the rules (World Athletics Technical Rules Book C 

 C 2.1, Rule 32 and World Athletics Track and Field 

Facilities Manual edition 2019: 
 
a) the surface inside the circle shall be lower than the surface outside by 20 mm 

± 6 mm

b) it is recommended that brass pipes diameter 20 mm should be laid flush in 3-4 points (evenly distributed) near the 
edge of the circle and they should be connected to the arena drainage system. 
 
The efficiency  of the throwing circle drainage depends upon the protection of the circle interior against dirt and sand. 
 
The surface finish of the circle inside should be a little smoother for hammer throwing than for discus throwing. If the 
circle is used both for discus and hammer throwing, the surface finish should be a compromise finish. 
 
The circle installed in the throwing facility ready for use (see below). 
 

 

 

V. Operation and maintenance 

The circle surface and the surrounding area should be kept clean and protected against humidity, sand and dirt using a 
special cover  PC16-S0512 (available separately). 
 

 

 

 
 
 
 

Содержание DC-250

Страница 1: ...Instruction manual Competition throwing circle DC 250 File 2020 06 25 PRODUCT SUPPORT Paweł Ciechanowski p ciechanowski polanik com ...

Страница 2: ...n the foundation of the discus throwing facility II Technical specification mm The producer reserves the right to introduce without warning changes in product constructions and colours Code DC 250 Inside dia mm 2500 5 Weight kg 41 Number of seg pcs 4 Construction galvanized steel segments screwed together with 8 blots inside surface painted in white IAAF certificate no E 05 0419 Packing foiled and...

Страница 3: ... each time if it is needed please move the segments to adjust the diameter to 2135 mm with allowance 5 mm Next tighten the screws with wrenches Finally check the diameter again Do not roll the assembled circle it must be transported carefully to the place of the installation IV Installation in concrete foundation The assembled circle is to be embedded in the concrete foundation approx 30 cm thick ...

Страница 4: ...the arena drainage system The efficiency of the throwing circle drainage depends upon the protection of the circle interior against dirt and sand The surface finish of the circle inside should be a little smoother for hammer throwing than for discus throwing If the circle is used both for discus and hammer throwing the surface finish should be a compromise finish The circle installed in the throwi...

Страница 5: ...Instruction manual DC 250 5 5 VI IAAF Certificate ...

Отзывы: