User manual
14
En
gli
sh
ø0.236in (6mm)
The following earthing methods are available:
Option A: Screw assembly (see figure below)
1. A grounding screw assembly must be attached to a grounding hole, using
only stainless steel hardware. First insert an M5 stainless steel screw through
the washer and then through the earthing hole.
2. Lightly tighten the stainless steel nut and locking washer on the screw.
3. Bend the EGC (ground conductor) into an omega (Ω) shape to fit between
the partially installed screw head and the washer. EGC must be in exclusive
contact with stainless steel.
4. Tighten the screw to a torque of 2.3 N ∙ m. The toothed locking washer
should be visibly coupled to the frame.
5. Route the EGC to the appropriate size to avoid contact with the aluminum
frame of the module.
Содержание Green House 370W
Страница 25: ...25 ONLINESHOP SRL...
Страница 26: ...26 A B C D E 1 2 3 5 4 A B C D E 1 2 3 EVA 4 5...
Страница 27: ...27 DC 30V...
Страница 28: ...28...
Страница 29: ...29...
Страница 30: ...30 PNI C PNI...
Страница 31: ...31 10 A B...
Страница 32: ...32 A B STC 1000 W m2 AM 1 5 25 C ISC 1 25 VOC 1 25 PV...
Страница 33: ...33 A B A B...
Страница 34: ...34 PNI PNI 4 mm2 40 C 90 C 40 mm...
Страница 35: ...35...
Страница 36: ...36 PV Array PNI...
Страница 37: ...37 EGC PNI EGC PNI 0 5V...
Страница 38: ...38 0 236in 6mm A 1 M5 2 3 EGC EGC 4 2 3 N m...
Страница 39: ...39 5 EGC 1 2 6 3 4 5 7 1 PV 2 3 KEPS 4 5 6 7 EGC...
Страница 40: ...40 B PNI C PNI PNI 2400 Pa 2400 Pa 5400 Pa PNI...
Страница 41: ...41 0 5 V PNI 10 cm...
Страница 42: ...42 1 M8 14N m 20N m 1 2 3 4 5 6 7 8...
Страница 43: ...43 1 PV 2 3 4 5 6 7 8 A B B 120 5400 Pa 2400 Pa 50 mm 16N m 24N m...
Страница 44: ...44 6 5 2 4 3 1 1 2 3 5 PV 6 7 L L L L L A B C A 1...
Страница 46: ...46 PNI PNI PV PH6 9 690 kPa PNI...
Страница 48: ...48 A B A B Sectiune transversala a cadrului...
Страница 49: ...49 SC ONLINESHOP SRL PNI Green House 370W LVD 2014 35 https www mypni eu products 8454 download certifications...
Страница 231: ......
Страница 232: ......