![PMI SWH3000 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/pmi/swh3000/swh3000_owners-manual_1569484003.webp)
Page 3
INSTALLATION
1. Remove the outlet grill, spacing control plate
and back panel
A. Remove the six screws on the sides of the
screen (Fig. 2).
B. Remove the four screws attaching the spacing
control plates (Fig. 3).
C. Keep all screws as they will be reused during
installation.
D. Remove back panel (Fig. 4).
Fig. 2 - Output Grille Removal
Fig. 3 - Spacing Control Plate Removal
A
B
Fig. 4 - Back Panel Removal
C
1st - Lift
panel up
2. Locate wall studs
NOTE:
This cooler is intended to be installed between
studs that are either 16" on center or 24" on center.
The unit cannot be installed between studs that are
less than 16" on center. If studs are less than 16" on
center a different installation location must be chosen
or structural changes must be made. Consult a qualified
professional before making structural changes to the
wall.
CAUTION:
When cutting or drilling into the wall,
do NOT damage electrical wiring or other hidden
utilities (water or gas lines, sewer lines, etc.).
3. Once you have selected the studs you intend to use,
mark the lines for the duct cutout.
Use a level and mark a horizontal line a minimum of
24" off the ground. Add a second horizontal line 14-¾"
above the first line. Mark two vertical lines 13-½" apart
to form a rectangle that is centered between the studs
that were selected for installation.
4. Ensure that the lines are in the correct places and
then cut through the entire wall including the drywall.
5. Measure the thickness of the wall.
If the thickness is less than 6", a spacer will be required
as specified in step 6.
If the thickness is greater than
6", skip step 6 and proceed to step 7.
1st - Lift
panel up
2nd - Pull
panel outward