background image

 
 
 

 

WWW.PME.COM 

TECHNICAL SUPPORT: [email protected] | (760) 727-0300 

PG. 18 

THIS DOCUMENT IS PROPRIETARY AND CONFIDENTIAL. © 2021 PRECISION MEASUREMENT ENGINEERING, INC. ALL RIGHTS RESERVED. 

 

The 

USB Connection 

allows communication between the miniPAR Logger and an external HOST 

computer. When connected, the miniPAR Logger is in HALT mode regardless of the Logger Control 
Switch position. When disconnected, the miniPAR 

Logger’s mode is controlled by the Logger Control 

Switch position. The switch position may be changed while the USB is connected. 

The 

Main Batteries 

(2 X AA on side opposite to pictured side above) provide main power to the 

miniPAR Logger. Note the positive (+) terminal. Batteries are described in Chapter 1 of this manual. 

3.4 Battery Replacement 

Be sure that the replacement batteries are compatible with the miniPAR Logger. PME recommends 
Energizer L91 AA size lithium batteries or Duracell AA size alkaline batteries. 

http://data.energizer.com/PDFs/l91.pdf 

http://ww2.duracell.com/media/en- 
US/pdf/gtcl/Product_Data_Sheet/NA_DATASHEETS/MN1500_US_CT.pdf 

Caution: Improper replacement of the batteries will damage the miniPAR Logger. 

Follow these steps: 

1.  Move the miniPAR 

Logger’s Control Switch to the “Halt” position. 

2.  Remove the depleted batteries

 noting the position of the (+) terminal

.  

3.  Switch minPAR to RECORD, then back to HALT. Wait 1 minute. 

4.  Use only new, fully charged batteries, both of the same type. 

5.  Install fresh batteries with the

 (+) position the same as the removed batteries

. The (+) 

position is also marked on the inside of the battery holder. 

6.  The miniPAR 

Logger’s LED Light should flash to indicate that the software is beginning 

operation within a second or two after you complete the battery installation. At this time the 
logger will enter the mode selected by the Logger Control Switch (which should initially be 
“Halt” from Step 1). 

Please be aware that the warranty will become void if the batteries are installed backwards. 

 

Enjoy your new miniPAR! 

Содержание miniPAR Logger

Страница 1: ...UPPORT INFO PME COM 760 727 0300 PG 1 THIS DOCUMENT IS PROPRIETARY AND CONFIDENTIAL 2021 PRECISION MEASUREMENT ENGINEERING INC ALL RIGHTS RESERVED 1483 POINSETTIA AVE STE 101 VISTA CA 92081 USA miniPA...

Страница 2: ...ty 3 SAFETY INFORMATION 5 Bursting Hazard 5 CHAPTER 1 QUICK START 6 1 1 The Quickest Start Possible 6 1 2 A Few Details 8 CHAPTER 2 SOFTWARE 13 2 1 Overview and Software Installation 13 2 2 miniPARCon...

Страница 3: ...excludes CT C sensors 1 year C Sense Logger Logger only 1 year For valid warranty claims made and covered defects existing during the applicable warranty period PME will at PME s option repair replac...

Страница 4: ...sible or liable to purchaser or otherwise for any indirect incidental special exemplary or consequential damages including but not limited to lost profits loss of data loss of use business interruptio...

Страница 5: ...come into contact with the enclosed batteries the batteries may generate gas causing the internal pressure to increase This gas will likely exit via the same location where the water entered but not...

Страница 6: ...tion and PAR measurements together with a time stamp indicating the time the measurements were made are recorded in text files in the folder having the serial number of your miniPAR Logger These files...

Страница 7: ...5 times The miniPAR Logger will now record a measurement of time battery voltage temperature PAR and 3 axis acceleration every 10 minutes or at some other interval you may have set using the miniPARC...

Страница 8: ...tery voltage or to select a different recording interval miniPARControl will also update the time if the logger has drifted in time 8 Optional Run the miniPARPlot program to see a plot of measurements...

Страница 9: ...occasionally to a HOST computer having an Internet connection The miniPARControl program will automatically set time based on an Internet time server Please refer to Chapter 2 for instructions on oper...

Страница 10: ...teries AA LITHIUM BATTERY LIFE The miniPAR Logger consumes battery power mostly from the measurement of PAR and temperature but also a small amount from simply keeping track of time writing files slee...

Страница 11: ...ry may leak Err on the side of caution when planning your deployment The recommended battery is the Energizer L91 lithium battery For more information including the performance at low temperatures cli...

Страница 12: ...intervals of 1 minute or less 5 Green Flashes Normal Indicates that miniPAR Logger is beginning to record measurements This indication appears in response to switching the Logger Control Switch to Re...

Страница 13: ...miniPARConcatenate jar program gathers all the daily files into one CAT txt file Manual pdf is the manual These files are located on the root directory of the miniPAR Logger PME suggests you leave the...

Страница 14: ...al button To set the interval enter an interval not less than 1 minute and not greater than 60 minutes Click the Set Sample Interval button Shorter and faster intervals are available Contact PME If th...

Страница 15: ...e scrolled with the mouse while the Control key is held depressed Copies of the plot can be obtained by right clicking on the plot and selecting Copy from the pop up menu Different DATA Folders can be...

Страница 16: ...contains the files recorded by the miniPAR Logger If the miniPARPlot program is run directly from the miniPAR Logger the program will suggest the folder located on the miniPAR Logger You may accept t...

Страница 17: ...g this procedure after being sure that the o ring is free from debris If debris is found then wipe it off with a clean lint free cloth PME recommends Kimtech Kimwipes for this application Lubricate th...

Страница 18: ...s or Duracell AA size alkaline batteries http data energizer com PDFs l91 pdf http ww2 duracell com media en US pdf gtcl Product_Data_Sheet NA_DATASHEETS MN1500_US_CT pdf Caution Improper replacement...

Отзывы: