SAFETY

The general equipment used for erecting tower are as follows:

-Gloves 

-Ropes  

-Spirit Level 

       

GENERAL EQUIPMENT

Always wear the Personal Protective Equipment (PPE) when erecting the access tower. 

-Safety Helmet.

     

W

ear a safety helmet in a construction site especially buildings where materials often fall from the upper level. 

     With safety helmet equipped, the chances of having injuries to the head can be minimized.

-Safety Footwear.

W

ear appropriate footwear that completely covers the feet unless the type of work undertaken require otherwise.

-Safety Harness.

    

W

ear safety harness when the maximum drop or free fall heights is 1.8m from ground to the working level.

    

T

he usage of safety harness with double lanyard is strongly recommended.

    

A

lways make sure the safety harness is hook to a safe and strong anchor support.

SAFE WORKING LOAD

The tower has a maximum total Safe Working Load (SWL) of 1000kg. This is the maximum load that can be
placed on the castors.
The safe working load at each level of platform is 275kg evenly distributed, regardless of whether one or two
platforms are installed. Therefore, even if two platforms are installed side by side, total cumulative load shall
not exceed 275kg distributed.

1

ERECTION MANUAL

USING 3T STEP

CORRECT 

DOUBLE WIDTH LADDER SIDE

SAFE WORKING 
LOAD  275 kgs
PER PLATFORM

SINGLE WIDTH LADDER SIDE

Содержание Quick Access

Страница 1: ...harness when the maximum drop or free fall heights is 1 8m from ground to the working level The usage of safety harness with double lanyard is strongly recommended Always make sure the safety harness...

Страница 2: ...nsult your supplier It is not permissible to attach and use hoisting arrangement on towers unless specification provided by design Lifting Equipment Tower component should be firmly secured by reliabl...

Страница 3: ...not let parts fall to the ground Such abuse may reduce the structure integrity and load capacity of the equipment In the event of damage the defective equipment must only be repaired by the qualified...

Страница 4: ...SW DW SW DW SW DW SW DW SW DW SW DW SW DW SW DW SW 104kg 112kg 119kg 115kg 132kg 140kg 119kg 126kg 134kg 127kg 134kg 143kg 140kg 147kg 158kg 4 RUNG LADDER DW DOUBLE WIDTH LADDER SIDE SW SINGLE WIDTH L...

Страница 5: ...ustable leg until there is no inclination from vertical Step 4 Place 4 rung frames secure them with frame clips Fit diagonal braces as illustrated Step 5 Locate stabilizers to each corners as shown an...

Страница 6: ...he frame resting on the first horizontal tube Ensure the brace trigger is facing to the outside of the tower Step 3 Fit the normal side frame to the brace hook resting on the opposite horizontal rung...

Страница 7: ...516692 V Lot 1797 Jalan Balakong Bukit Belimbing 43300 Seri Kembangan Selangor D E Malaysia Tel 603 8961 8355 Fax 603 8961 1904 Email sales qaccess scaffolds com Website www qaccess scaffolds com SING...