![Plumbline Progetto OL003 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/plumbline/progetto-ol003/progetto-ol003_installation-instructions-manual_1568646010.webp)
10
Pull out the protection cap.
1
Hot
Water
Cold
Water
Outlet 1 (e.g. Shower)
LIMITI DEL RIVESTIMENTO LIMITS FOR WALL LINING LIMITES DU REVETEMENT
MIN
MAX
Slide the plate over the body and to prevent
any rotation, fix it to the wall using some glue.
2
Fixing holes
please note: the finished wall
lining surface must be within
the minimum/maximum position
marked on the protection cap
INSTALLATION INSTRUCTIONS
OLI316 DIVERTER MIXER
| OL033
Outlet 2 (e.g. Bath)