3
3.
Insert dowels (CC) into predrilled holes in top
edge of both pilasters. Slip front panel (G) down
and over dowels (CC) until it rests snugly on the
pilasters. Secure front panel (G) with bolts (AA)
inserted through washers (BB) and pre-drilled
holes in glue blocks on front panel (G) and side
assemblies as illustrated. Tighten with screw-
driver.
4.
Insert dowels (CC) into predrilled holes in top
edge of mantle assembly. Set top panel (A) over
dowels (CC) and onto mantle assembly. From
underneath, insert bolts (AA) through washers
(BB) and into pre-drilled holes as illustrated.
Tighten with screwdriver.