For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
GYRO-POD SPINNER RV
INSTALLATION INSTRUCTIONS
Rev B
1/5/2017
RV-1974
Page 2 of 8
** Height shown from finish grade to mounting hole.
Step 1
Refer to Footing Layout and mark footing hole location.
Dig (1) Ø 18" footing hole. Refer to Footing Detail for
depth and details.
* Footing depth must be adjusted to compensate for the
depth/thickness requirements of selected safety
surfacing. See Section 06.1 of the Installation Manual.
Footing Detail
Pea Gravel (for drainage)
Compressed depth shown. (See Note E)
2b Stone, drain rock
Concrete Footing
Footing Pin
9" compressed or 12" uncompressed depth.
Installers Manual
Blocking, see
LOOSE FILL SURFACING MATERIAL SHOWN:
Optional Filter Fabric over
Undisturbed Soil
(Finish Grade)
(Top of Soil)
2
"
1638mm
(See Note D)
64
1
37 "
2
1
*
953mm
2
"
724mm
18"
1
28
457mm
**
76
1
2
"
1943mm
**