19
STEP 7
1. Attach Barrier Boards to Frame B as shown.
Frame B
Post C
Post B
Post A
PF 4106
1’’x4’’x39-1/2’’
PF 4136
1’’x4’’x39-1/2’’
WINDOW
CUTOUT ARCH
(2) PF 4091
1’’x4’’x12-3/8’’
Flush
PF 4119
1’’x5’’x39-1/2’’
ARCH
73-1/8’’
PF 4100
1’’x4’’x28-1/4’’
FENCE
2-1/2” Deck Screw (x17)
PF 4106
1’’x4’’x39-1/2’’
2” Deck Screw (x17)
(3) 2” Deck
Screws
(2) 2” Deck
Screws
(3) 2-1/2” Deck
Screws
per joint
(2) 2-1/2” Deck
Screws
64-3/4”
Содержание Swing-N-Slide PB 8154
Страница 27: ...27 2 1 2 Deck Screw x4 1 Attach boards as shown STEP 15 PF 4050 1 x4 x25 1 4 ...
Страница 37: ...37 STEP 25 1 Attach Window as shown Window 3 4 Flat Head Screw x10 INSIDE VIEW ...
Страница 46: ...46 STEP 34 1 4 x 1 3 4 Pan Screw 1 4 Washer 11 1 3 4 Pan Screw x2 1 Attach Play Handle as shown ...
Страница 59: ...59 1 Attach ID Tag as shown 1 2 Pan Screw x2 Design 1 Design 3 ID TAG Design 2 ...