background image

Parts List

PART NUMBER

EC-043

MEC-043

DESCRIPTION

402558

1

1

FINGER MAZE PANEL

404242

0

2

RECYCLED UPRIGHT

404247

2

0

WOOD UPRIGHT

404273

1

1

 

801019*

4

4

3/8" x 5" HEX HEAD BOLT

804353*

4

4

3/8" LOCK NUT

817200*

8

8

3/8" INTERNAL TOOTH LOCKWASHER

G030*

8

8

10MM DO-NUT BASE

G032*

8

8

10MM DO-NUT CAP

Issued/Revised: 

SHEET 1  OF 4 

5/26/17

MEC-043 FINGER MAZE PANEL (Recycled)

1-866-814-8697

bigtoys.com

HARDWARE COMPLETE

EC-043 FINGER MAZE PANEL (Wood)

Items listed below Hardware Complete line are included with Hardware Complete Number

Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store

Unused Parts Appropriately Until Assembly Is Completed. Once Assembly Is Completed, Remove Any

Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location. Any bolt end

protruding more than two full threads beyond the face of the nut causes risk of clothing entanglement.

Promptly cut-off flush, file smooth, and treat to prevent corrosion.

Unless Otherwise Specified, All Units of Measure are Each

Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.    

Note: Loctite (supplied by others) should be used on any non-patch hardware.

INSTALLATION INSTRUCTIONS:

 
1. Dig footing holes as shown in Elevation and Plan Views.
 
2. Locate Uprights and attach Finger Maze Panel using 3/8" x 5" Hex Head Bolt , 3/8" Internal Tooth Lock Washer, 3/8" Lock Nut, 
    Do-Nut Base 10mm and Do-Nut Cap 10mm as shown in Detail 130. See Plan View for orientation.
 
3. Plumb and level the entire assembly and tighten all fasteners.
 
4. After entire unit is assembled, pour concrete footings within 4" to the top and taper away from post for water drainage. Allow
    to cure at least 48 hours before use. Temporary bracing may be required until concrete cures.
 
5. When the structure is finished and satisfactory, eliminate sharp points and sharp edges (burring) on installed hardware like
    bolts, nuts etc. Install resilient surfacing material within the use zone of play structure in accordance with ASTM
    specifications F1292 appropriate for the fall height of each structure. Refer to the safety guidelines.

MAINTENANCE PROCEDURE:

Periodically check hardware for tightness, and tighten as necessary. Always check all parts for breakage or wear, and immediately 
put equipment out of service until any faulty parts found are repaired or replaced.  Also Check all metal parts for rust, paint loss and 
touch-up if necessary with paint. Check for welded areas and verify integrity. Check periodically resilient surfacing for appropriate 
depth and remove extraneous materials that could cause injury, infection, or disease. Maintain detailed installation, inspection, 
maintenance, and repair records for each public-use playground equipment.
 

Отзывы: