Installation | Power and Control Connections
55
Cooling Pad | Installation and Operation Guide Rev B | Doc P/N: 080205039E
3.5 Power and Control Connections
Connect the pump power cable to the cooling pad system control cabinet
3.6 Final Checkup
To complete the final checkup, verify the following:
z
All spaces between the housing walls and the cooling pad system
are sealed (this is the customer's responsibility)
z
All parts are in place, all screws are fastened, and the system is
clear of any tools or unused parts
WWW