Installation | Assembly Instructions
46
Cooling Pad | Installation and Operation Guide Rev B | Doc P/N: 080205039E
Step 10: Installing Distribution Pipe
1.
and attach the reducing nipple (31)
to the T-connector (14) sticking out of the gutter.
to the other side of the reducing nipple
and attach the 90° elbow (34) to it
3.
and attach the reducing nipple (31)
to the T-connector (14) sticking out of the gutter.
to the other side of the reducing nipple
and attach the 90° T-connector (50) to it
2.
Attach the distribution
pipe (32) to the 90° elbow
4.
Attach the distribution pipes (32)
to the 90° T-connector
NOTE:
To increase length of
distribution pipe, attach
two pipes together using
a coupler (59)
59
14
14
31
31
34
32
32
32
50
WWW