Installation | Assembly Instructions
31
Cooling Pad | Installation and Operation Guide Rev B | Doc P/N: 080205039E
Step 2: Assembling the Reservoir Channel
6
1.
Fill the contact grooves of the reservoir
channel couplers (6) with adhesive
2.
Attach the sections of the
reservoir channel until the
desired length is reached
NOTE:
Clean all contact surfaces using an
approved CPAD reservoir channel
cleaning agent (ethanol C2H5OH
99.5%) prior to applying adhesive.
WWW