22 Post-installation checklist
After installing the unit, carry out all relevant checking and calibration tasks
defined in the following checklist.
NOTE
The relevant checking and calibration tasks vary depending on the optional
equipment and features included in the delivery.
For information on how to carry out the checking and calibration tasks, see
the technical manual.
Customer
Installation location
Software version
Serial number
Installation date
Junction box
Check the main air and water connections
Check the drain and suction line connections
Check the mains voltage cable and grounding connections
Voltage jumper setting (connector P21): __________VAC.
Check the additional electrical connections
Suction motor control, assistant call etc.
Check the connections for optional features
Ethernet, USB cable, etc.
Perform the needed settings. Refer to dental unit and Planmeca Romexis
technical manuals.
IP address: ______
Subnet mask: ________
Adjust the internal air and water pressures
In the service mode 38 (air 5.0...5.5 bar, water 2.5…2.8 bar).
Check the operation of the suction system
Suction system type: ______________________________
Check the operation of the foot control
Calibrate, if needed.
Check the operation of the suction arm
22 Post-installation checklist
Installation manual
Planmeca Compact i3 97
Содержание Compact i3
Страница 1: ...PlanmecaCompact i3 installation manual EN 30020733 30020733...
Страница 68: ...12 Installing suction element 64 Planmeca Compact i3 Installation manual...
Страница 104: ......
Страница 105: ......