b. SETTING UP
1. Please confirm parts in the package are of the complete set. The unit should be
placed on solid and level ground, and be located in place with good air circulation.
The unit should be placed no less than 50 cm from the wall. Please lock the
brakes by pushing down the levers on the wheels to get the machine in fixed
position.
2. Do NOT connect the machine to power within the first half hour, letting the machine
in a standing position to make sure the refrigerant agent to return to the compressor.
Upon arrival, instant plugging to power may damage the compressor.
3. Make sure to use an electrical socket capable of handling not less than 10A.
4. For the first time operation, it is recommended to fill city water into bottom tank till
top tank water level on screen indicating 3 levels. Then drain out one liter of water
each by pressing Cool and Hot buttons. Drain off all the remaining water from the
back HOT Water Drain outlet.
c. OPERATIONAL STAGE
1. When the unit starts to operate, you should be able to hear a “beep” sound,
The light on the VFD should also be lit. The compressor will run within 2 minutes,
and you will see the corresponding light on the VFD is lit. If the unit is required to be
shut off, keep POWER button pressed for 5 seconds. Press POWER again to
switch it on.
2. Don’t be alarmed when you don’t obtain hot or cold water during the first few days
of operation. Only when the water level in the tanks reaches to the right level then
the heating/cooling mechanism will be triggered. (Generally, the first
heating/cooling will start in ten to twenty hours during the first operation, depending
on local temperature and humidity conditions.)
3.
When there is enough water in your machine, you can press “HOT” key on the
panel to switch on or off heating process. The red “
” indicator will be lit on when
heating is switched on. It will turn off when the machine is not in heating process.
The heating mechanism will be triggered on and the red “
” indicator will blink
when water level reaches preset condition. It will turn off automatically when water
is hot enough. During heating stage, press HOT button to switch off heating
process.
4.
When there is enough water in your machine, press “COOL” key on the panel to
switch on or off cooling process. The green “
” indicator light will be lit on when
cooling is switched on. It will turn off when the machine is not on cooling process.
The cooling mechanism will be triggered on and the green “
” indicator will blink
when water level reaches preset condition. It will turn off automatically when water
is cool enough. During cooling stage, press COOL button to switch off cooling
process.