![Planet TSN-6325-8T4S4X Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/planet/tsn-6325-8t4s4x/tsn-6325-8t4s4x_quick-installation-manual_1563352005.webp)
5
3. Wiring the Power Inputs
The Upper Panel of the
Industrial Managed Switch
indicates an inlet
power socket and consists of one green terminal block connector within
6 contacts. Please follow the steps below to insert the power wire.
1. Insert positive/negative DC power wires into Contacts 1 and 2 for
Power 1, or Contacts 5 and 6 for Power 2.
DC 9-48V, AC 24V
Max. Fault Alarm Loading: 24V, 1A
DI1 DO0 DO1
DI0
GND
GND
V1+
V2+
PWR1
PWR2
Alarm
DC Input: 9-48V , 5A max.
AC Input: 24V , 2A max.
1 2 3 4 5 6
1 2 3 4 5 6
Figure 3-1:
TSN-6325-8T4S4X Upper Panel
Tighten the wire-clamp screws for preventing the wires from loosening.
1 2 3 4 5 6
V+
V-
V+
V-
Power 1
Power 2
Figure 3-2:
Power 1 & 2 Pins of Terminal Block Connector
Note
1. The wire gauge for the terminal block should be in the
range from
12
to
24 AWG
.
2. Please check the AWG Ampere specification before
connecting PLANET Industrial Managed Switch.