background image

4

2. Hardware Introduction

2.1 Physical Dimensions

Содержание IGS-604HPT-M12

Страница 1: ...Industrial IP67 rated 4 Port 10 100 1000T 802 3at PoE 2 Port 10 100 1000T M12 Managed Ethernet Switch 40 75 degrees C IGS 604HPT M12 Quick Installation Guide...

Страница 2: ...Male to RJ45 8 pin Straight through UTP Cable Wiring 6 2 6 M12 DC Power Connector Pin Assignment 8 2 7 M12 DC Power Cable Wiring 8 3 Connecting M12 Cable to the IGS 604HPT M12 9 4 Switch Management 1...

Страница 3: ...Open the box of the Industrial Managed Switch and carefully unpack it The box should contain the following items 1 x The Industrial Managed Switch 1 x Quick Installation Guide 1 x 2m 8 pin A code M12...

Страница 4: ...4 2 Hardware Introduction 2 1 Physical Dimensions...

Страница 5: ...ts to indicate DC power input 1 has power PWR 2 Green Lights to indicate DC power input 2 has power Fault Red Lights to indicate that the Industrial Switch has failed Ring Green Lights to indicate tha...

Страница 6: ...e connected device is not a PoE powered device PD 2 4 M12 10 100 1000T Connector Pin Assignment The Industrial Managed Switch front panel provides six 10 100 1000BASE T Ethernet ports in the form of M...

Страница 7: ...erwise the Ethernet performance will be poor Note The standard RJ45 receptacle connector There are 8 wires on a standard UTP STP cable and each wire is color coded The following shows the pin allocati...

Страница 8: ...female connector from the Industrial Managed Switch package for DC power input The M12 DC power cable pin assignment is shown below M12 DC power cable pin assignment wire code V1 positive pin black ca...

Страница 9: ...the waterproof screw nuts of an M12 connector and power input Step 2 Insert the M12 UTP male connector into the M12 female Gigabit Ethernet port of the Industrial Managed Switch Step 3 Turn clockwise...

Страница 10: ...rt of the power input Step 5 Turn clockwise to tighten the screw nut of the M12 power connector Note Before connecting the DC power cord please check whether your local DC power source is stable Note...

Страница 11: ...Industrial Managed Switch is not accessible please turn off the anti virus soft ware or firewall and then try it again 4 2 Starting Web Management The following shows how to start up the Web Managemen...

Страница 12: ...nterface 2 When the following dialog box appears please enter the default user name and password admin The login screen in Figure 4 1 appears Default IP Address 192 168 0 100 Default Username admin De...

Страница 13: ...can use the Web management interface to continue the Switch management Please refer to the user s manual for more details 4 4 Saving Configuration via Web In the Industrial Managed Switch the running...

Страница 14: ...hanges and set the current configuration as a startup configuration the startup configuration file will be loaded automatically across a system reboot 1 Click System Save Startup Config 2 Press the Sa...

Страница 15: ...ustrial Managed Switch and 6 LNK ACT LEDs will be lit 4 Resetting Industrial Managed Switch to the factory default is done when 6 LNK ACT LEDs are lit again 5 Remove the RJ45 cable from port 1 and por...

Страница 16: ...anet com tw en support faq php type 1 Switch support team mail address support_switch planet com tw IGS 604HPT M12 User s Manual http www planet com tw en support download php type1 22153 model 48896...

Отзывы: