background image

4

EH-2400 Installation

Follow the instructions below to set up EH-2400.

Step 1

. Select a suitable place to put the hub or to install. Make sure there is an AC outlet nearby.

Step 2.

Power off all of the computers, hubs, or other devices that will be connected to the hub.

Step 3.

Connect the power cord to the hub and AC outlet on the wall.

Step 4.

  Power on the Power switch on the rear panel. The power LED should light up.

Step 5.

  Connect all the cables and connectors.

Connecting the Hub to AC Power

After making network connections as described in the preceding sections, you are ready to plug the hub in and
turn it on.

The input voltage is from 90 to 240 volts AC and any frequency from 50 to 60 hertz. Adjustment to the power
source is automatic; there is no switch to set.

Before plugging the hub in, make sure the power cord

(1)

 

is long enough to reach an AC wall outlet of an approved

 

type,

(2)

 

has plugs that match both the hub's power inlet and the type of wall outlet you will use, and

(3)

 

Conforms to safety regulations in your area.

In most parts of the world you must use a three-conductor

 

power cord with an integral three-prong grounding

plug.

If the supplied power cord does not meet all three requirements given above, contact your computer equipment
dealer and obtain one that does. Do not use an extension cord or multi-socket adapter; do not attempt to use a
cord designed for any other kind of power inlet or wall outlet; do not use a cord that fails to meet safety
standards in your part of the world.

Power Failure

To prevent costly equipment damage and downtime, please consider installing a surge suppression device
or a UPS (un-interrupted power supply).

Содержание EH-2400

Страница 1: ...EH 2400 Ethernet Hub User s Manual...

Страница 2: ...ctions may cause interference to radio communications This equipment has been tested and found to comply with the limits for a Class B computing device pursuant to Subpart J of Part 15 of FCC Rules wh...

Страница 3: ...GENERAL DESCRIPTION 2 FRONT PANEL OF EH 2400 2 LED INDICATOR 2 REAR PANEL OF EH 2400 3 CHAPTER 3 INSTALLATION 4 GETTING READY TO INSTALL THE EH 2400 4 PREPARE TO INSTALL EH 2400 4 EH 2400 INSTALLATIO...

Страница 4: ...nchester decoder for clock and data recovery q Automatic preamble regeneration to compensate for any bit loss q Lockup and auto partition for jabber to isolate network failures q Built in Micro proces...

Страница 5: ...s when network collision are detected Jabber Blinking Red Blinks when network jabbers are detected TX RX Steady Green Indicates Link integrity pulses are being received Blinking Green Blinks when data...

Страница 6: ...STP UTP cable should be 22 24 or 26 AWG with a minimum of one twist per foot 24 AWG is recommended The cable should have a nominal impedance of 100 ohms at 10 MHz a maximum segment loss of 11 5 dB be...

Страница 7: ...is automatic there is no switch to set Before plugging the hub in make sure the power cord 1 is long enough to reach an AC wall outlet of an approved type 2 has plugs that match both the hub s power i...

Страница 8: ...ator for assistance SYMPTOM The Link LED is not lit SOLUTION The Link LED is not on after a workstation is connected to the STP port of the concentrator 1 Verify if the workstation and the concentrato...

Страница 9: ...STP port 1 port 10Base T UpLink port 1 port AUI port 1 port BNC port LEDs 1 Power collision Jabber LED 8 Utilization LEDs 24 TX RX LEDs 24 Partition LEDs Power System 90 260 VAC 50 60Hz Power Consump...

Отзывы: