During this time, the solenoid and heater will not operate, but the controller will
continue to monitor the chamber temperatures to ensure that it can resume the
profile upon return of mains power.
If power resumes within 1 minute, the run will continue. If power is removed for
more than 1 minute, the run will be automatically terminated.
Operating the Kryo250 2 - 7
Содержание Kryo250
Страница 1: ...Kryo250 Operators Manual...
Страница 26: ...2 8 Operating the Kryo250...
Страница 35: ......
Страница 36: ...MA009478 Kryo250 Operators Manual...