![Planer Integra 750Plus Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/planer/integra-750plus/integra-750plus_instructions-for-use-manual_1562041029.webp)
29
Operating the Integra 750Plus
3.4.1
Routine maintenance
·
Before cleaning:
o
Switch off the equipment.
o
Disconnect the mains supply at the wall socket.
o
Turn off any connected liquid nitrogen cylinders.
o
Open the red pressure relief valve on the pump. Wait until the pressure on the
gauge has fallen to zero and the flow of gas has stopped.
·
Ensure that the equipment has been cleaned as necessary to ensure that it is safe
to handle and service and is free from any biohazard or toxic materials.
Periodically:
·
.
·
Check all nitrogen fittings.
·
Check all mains cables and interconnecting cables.
·
The equipment is classified as Class I equipment and must be earthed for safe
operation.
·
Repetition of potentially damaging high-voltage flash tests should be avoided.
·
To ensure adequate earth bonding, the equipment and mains cables must be regularly
checked by suitably trained personnel using a Portable Appliance Tester or similar
equipment.
·
The earth continuity of the mains installation must be regularly inspected by the
person responsible for the safety of the installation.
3.4.2
Cleaning the Integra 750Plus freezer
1. Clean surface dirt with a cloth containing water and detergent.
2. Then clean all surfaces with 70% IPA (alcohol).
3. Finally clean the surfaces again with a cloth containing water.
29
Содержание Integra 750Plus
Страница 1: ...Instructions for use Integra 750Plus MA008797 13 0 2651...
Страница 2: ......
Страница 5: ...Introduction to the Integra 750Plus...
Страница 15: ...Installing the Integra 750Plus...
Страница 22: ......
Страница 23: ...Operating the Integra 750Plus...
Страница 32: ......
Страница 33: ...Troubleshooting...
Страница 37: ...Additional information...
Страница 42: ......
Страница 45: ......