
© 2019 Pivotal Commware, Inc. All Rights Reserved.
Pivotal Commware® is a registered trademark of Pivotal Commware, Inc.
Page 8 of 32
Cleaning Wipes (1)
To clean both sides of the window before mounting to ensure a good bond
Allen Wrench (1)
To loosen the set screws on each side of the device so the device can be slid off the rails.
Removal Tool (1)
To remove the rails and rail adhesive if necessary.
General Configuration
Here
’
s an example of the Echo 5G system configuration along with a diagram of the components that
are installed on your window.
Figure 3: Window-mounted system: Echo Outdoor Unit (ODU) attaches to outside of window and smaller Indoor Unit (IDU)
attaches to inside.