Clearances:

Minimum clearance of 6" (15cm) must be maintained
from combustible construction on each side and the
rear of the equipment. This equipment may be in-
stalled on combustible floors.

Maintain a minimum of 24"(61cm) clearance in front
of the fryer to provide for proper operation, mainte-
nance and servicing.

Wiring diagram(s) are located in the back of the ser-
vice manual and inside the fryers.

The control (interlock) voltage for this equipment
must be 120VAC (US & Canada). For other coun-
tries please check the rating plate.

Regular cleaning of this equipment, as well as the
hood, is an important part of proper maintenance.
Refer to Maintenance Requirement Cards for proper
procedure and frequency.

Once the fryers are in place:

Leveling the fryers will help ensure proper opera-
tion. To level the fryers loosen the two set screws on
the caster stem. Rotate the collar of the caster to raise
or lower the height of the unit. Tighten set screws to
lock the adjustment. Casters should be adjusted so
that the fryers are level and at the correct height un-
der the hood system.

Clean the fry tanks using the Boil Out procedure on
Maintenance Card 14A.
A wiring diagram is located in the back of this manual
and inside the fryers.

EQUIPMENT SET UP AND SHUT DOWN

PROCEDURES

NOTE:

 Should you experience a power failure, your

fryers will shut off automatically. Once the power
has been restored, press the 

 key to turn the fryer

back ON. If the machine is being filtered, close the
RED return valve so that the filter does not run if the
machine is left unattended. Do not attempt to restart
the fryers until the power is restored.

INSTALLATION INSTRUCTIONS

CAUTION:

This equipment is manufactured for the use on a
particular voltage and phase which is specified on
the rating plate located on the inside of the door.

When your fryers arrive, look them over carefully
noting any damage on the freight bill. If concealed
damage is found after you have accepted the equip-
ment, report it to the carrier immediately as all claims
must be filled within 15 days of the receipt of the
shipment. Also, be sure to keep all packing materi-
als as these will be necessary to make any claim.

Follow these installation instructions carefully. A
proper installation is important for the operation of
the fryers.

All installations must conform to all local and state
codes and well as the United States National Elec-
trical  Code (ANSI/N.F.P.A. No. 70-1987). In
Canada, installations must be made in accordance to
Canadian Electrical Code Part I, CSA-C22.1.

Do not block the area around the casters and under
the fryers. Contact the Autorized Pitco Frialator rep-
resentative for any service related problems. Rou-
tine maintenance may be performed by qualified
personnel.

The duct system, the hood system and the fryers must
be cleaned on a regular basis and must be kept clear
of any grease build up. See the appropriate Mainte-
nance Requirements Cards.

Ventilation:

A proper ventilation system is also an important part
of the installation.  For information on the construc-
tion and installation of ventilating hoods, please see
“Standard for the Installation of Equipment for the
Removal of Smoke and Grease Laden Vapors from
Commercial Cooking Equipment”, N.F.P.A. No. 96-
1987. Copies can be obtained by writing to the Na-
tional Fire Protection Association, Battery March
Park, Quincy, MA  02269

Содержание ME14S-C/MFD

Страница 1: ...1 603 225 6684 Toll Free 1 800 258 3708 Fax 1 603 225 8497 Literature L20 139 Rev 1 Rev Date January 2002 Made in the United States of America Pitco Frialator Service Manual ELECTRIC FRYER with FILTE...

Страница 2: ...familiarize yourself with your new cooker before operating it and heed the notices throughout this manual The WARNINGS are listed below and on the following page for your review prior to operatng the...

Страница 3: ...tion manual WARNING Never melt blocks of shortening on top of the heating elements This will cause a fire and void your warranty WARNING WaterandshorteningDONOTmix Keepliquidsawayfromhotshortening Dro...

Страница 4: ...5 Hood Relay System 5 Chapter 3 COMPONENT TROUBLESHOOTING 5 Probe 5 Relays 6 Hi Limits 6 Drain Valve Return Valve Switches 6 Transformer 6 Elements 6 Contactor 6 Chapter 4 TROUBLESHOOTING 7 Fryers 7 F...

Страница 5: ...ll either weld or replace at its discretion the frypot B The customer will be responsible for all freight labor and travel charges for this re pair except within the period stated in sec tion 1 B 3 WA...

Страница 6: ...tart the fryers until the power is restored INSTALLATION INSTRUCTIONS CAUTION This equipment is manufactured for the use on a particular voltage and phase which is specified on the rating plate locate...

Страница 7: ...level and the H Hot level is considered to be the MAXIMUM oil level For solid shortening the shortening must be cut into small blocks about 1 2 54 Cm in size These small blocks must be placed under an...

Страница 8: ...in cludes either side of a split vat to be turned ON will energize a Relay K15 that will turn the Hood sys tem ON The Power On Relay K2 will be ener gized closing the circuit If the Hi Limit S1 is NOT...

Страница 9: ...f the probe the resistance change will become more linear If the probe is suspect check its resistance and the oil air temperature at which it was taken Compare these values on the chart below TEMP RE...

Страница 10: ...the switch does not reset it is defective Drain Valve Return Valve Switches This switch is a magnetically operated Reed switch When the Drain Valve handle is moved to the open position the Actuator wi...

Страница 11: ...if defective F Heat Demand relay D Check replace if defective G Elements E Check replace if defective F Check replace if defective G Check replace if defective Machine is heating slowly A Heat Demand...

Страница 12: ...e to check that it is still shows DRAINING or B Sensor switch may be loose or bad fully closed TURN OFF B Check that the switch is tight in its mounting If switch is bad replace it Drain Valve is OPEN...

Страница 13: ...from around the capillary of the Hi Limit 7 Pull the Hi Limit up through the hole Install in the reverse order Elements 1 Remove the rear housing 2 Remove the 2 probe brackets 3 Remove the Hi Limit Bu...

Страница 14: ...opening Heat Demand Relays Mounted on the rear brace of each fryer unit you will find the Heat Demand Relay housing Remove the cover of the housing from the front of the machine The Relays can now be...

Страница 15: ...ing screws Install in the reverse order Filter Pumps 1 From the front of the machine pull the ring back on each of the 2 quick disconnects and release the couplings 2 Remove the 2 screws and the fron...

Страница 16: ......

Страница 17: ...PARTS SECTION...

Страница 18: ...1844601 SPLIT VAT RELAY BACK COVER 5 B5303201 RELAY WITH HEAT SINK 6 P6071220 GROMMET 7 B6746902 FULL VAT HI POWER RELAY HARNESS B6746901 SPLIT VAT HI POWER RELAY HARNESS 8 A1845201 RELAY GUARD NOT SH...

Страница 19: ......

Страница 20: ...VER A1625902 STAINLESS STEEL CAB BACK COVER 5 A1843901 ALUMINIZED GREASE SHEILD A1843902 STAINLESS STEEL GREASE SHEILD 6 A1629101 SINGLE CABINET BACK A1629102 STAINLESS STEEL SINGLE CAB BACK A1629201...

Страница 21: ......

Страница 22: ...VAT ELEMENT PROBE CLAMP 4 PP10954 10 32 X 1 2 SCREW 5 PP11010 HI LIMIT BULB 6 A1404402 HI LIMIT BULB BRACKET 7 PP11007 208 VOLT ELEMENT PP11008 220 VOLT ELEMENT PP11009 240 VOLT ELEMENT 8 PP11018 ME T...

Страница 23: ......

Страница 24: ...ASHER P0020900 1 4 20 HEX HEAD SCREW 7 B6640701 C FILTER DRAWER HANDLE 8 B6640601 C FILTER DRAWER WELDMENT 9 PP11152 ROLLER WHEEL KIT 10 B6656801 C FILTER DRAWER EXTENSION RAIL RH B6656802 C FILTER DR...

Страница 25: ......

Страница 26: ...X LINKAGE BAR 8 PP11310 CLEAVIS PIN 9 P0190300 COTTER PIN 10 A2608901 PIVOT BOX STOP BRACKET 11 PP11010 HI LIMIT SWITCH 12 PP11045 FULL VAT HINGE WITH HOLES PP11046 SPLIT VAT HINGE WITH HOLES 13 A2608...

Страница 27: ......

Страница 28: ...4 PP10266 4 40 X 1 4 SCREW 5 PP10647 1 2 13 NUT 6 PP11059 PLUNGER ASSEMBLY 7 A4015801 DRAIN HANDLE RELEASE LEVER 8 PP11303 RELEASE LEVER VINYL COVER 9 B4003001 C FULLVAT HANDLEASSEMBLY Complete drain...

Страница 29: ......

Страница 30: ...IT VAT RH DRAIN TEE B6653001 SPLIT VAT LH DRAIN TEE B6643506 SPLIT VAT CENTER DRAIN TEE B6643303 FULL VAT LH DRAIN TEE B6643203 FULL VAT RH DRAIN TEE B6643504 FULL VAT CENTER DRAIN TEE 13 A7011901 FIL...

Страница 31: ......

Страница 32: ...1 B5002701 DUALELECTRICCAPPINGPIECE B5002702 TRIPLE ELECTRIC CAPPING PIECE B5002703 QUAD ELECTRIC CAPPING PIECE ME14 FRYERACCESSORIES PARTS LISTS I D PART PARTDESCRIPTION...

Страница 33: ......

Страница 34: ...ME14 SCHEMATIC 700246H...

Страница 35: ...ME14 DOMESTIC FULL SPLIT VAT CONTROL SCHEMATIC 700246H...

Страница 36: ...ME14 DOMESTIC FULL SPLIT VAT HI POWER SCHEMATIC 700246H...

Страница 37: ......

Страница 38: ...ntative ASAP cov eringyouarea throughtheNationalServiceNetwork at 800 298 1862 US only 24 hours Intheeventofproblemswithorquestionsaboutyour order please contact the Pitco Frialator factory from 8 00...

Отзывы: