background image

5

EN

ENGLISH

2.  MOUNTING THE BODY BRACKET HANDLES

 

Parts Required:

2  x  Body Bracket Handle (#5)

4  x  Screw (#D)

4  x  Locking Washer (#F) 

4  x  Washer (#G) 

 Installation:

•  Insert the open end of a Body Bracket Handle into the top end of the 

Body Bracket, pushing it in until the mounting holes align. Secure using 

two washers, locking washers, and screws. Repeat installation for the 

second Body Bracket Handle. See illustration for proper arrangement.

3.  SECURING THE CHIMNEY

 

Parts Required:

1  x  Chimney Assembly (#1)

4  x  Screw (#E)

 Installation:

•  First, twist the Chimney Cap off of the Chimney Stack. This will make 

the Chimney Stack easier to install. Locate the round opening on the 

top of the Barrel Lid. From the outside, secure the Chimney Stack to the 

top of the Barrel Lid using four screws. The screw will fasten to the self-

clinching nut on the inside of the Barrel Lid. Note illustration 3A.

•  Replace the Chimney Cap by twisting it back onto the top of the Chimney 

Stack. Note illustration 3B.

NOTE: Adjust the Chimney Cap to affect the airflow inside the 

Smoker. If cooking at low temperature, keep the cap more closed to 

restrict airflow. If cooking at a high temperature, keep the cap more 

open to increase airflow.

4.  MOUNTING THE LID HANDLE

 

Parts Required:

1  x  Lid Handle (#3)

 Installation:

•  Remove the pre-installed screws, locking washers, and washers from the 

Lid Handle. From the inside the Lid of the Barrel Body, insert one screw, 

locking washer, and washer to protrude to the outside, then secure the 

screw (from the inside) into the Lid Handle. Repeat same installation for 

other end of the Lid Handle.

2

3A

3B

5

5

GFD
GFD

A

E

E

E E

4

3

Содержание 10806

Страница 1: ...PROPERTY DAMAGE BODILY INJURY OR EVEN DEATH CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA AVERTISSEMENT VEUILLEZ LIRE L INT GRALIT...

Страница 2: ...7 North Gainey Center Drive Scottsdale AZ USA 85258 CUSTOMER CARE www pitboss grills com TABLE OF CONTENTS Parts Specs 3 Assembly Preparation 4 Assembly Instructions 4 Installing The Wheels 4 Mounting...

Страница 3: ...Shelf Bracket Right x2 9 Air Intake Pipe x2 10 Air Intake Silicone Pad x2 11 Hanging Rack x1 12 Cooking Grid x3 13 Heat Diffuser Plate x1 14 Charcoal Basket x1 15 Charcoal Tray x1 16 Door Handle x1 17...

Страница 4: ...as shown From below add a Wheel Washer then secure using the Wheel Cotter Pin Repeat same installation for the other Wheel NOTE Once installed both wheels should spin freely ASSEMBLY PREPARATION Part...

Страница 5: ...Chimney Stack to the top of the Barrel Lid using four screws The screw will fasten to the self clinching nut on the inside of the Barrel Lid Note illustration 3A Replace the Chimney Cap by twisting i...

Страница 6: ...holes with the Barrel Body as shown Then tighten each of the four screws halfway first Secure a fifth screw from the inside of the Barrel Body into the upper part of the Air Intake Pipe Once all five...

Страница 7: ...x Thermometer 2 Installation First remove the pre installed nut and washer from the stem of the Thermometer From the outside of the Barrel Body insert the stem of the Thermometer from the outside then...

Страница 8: ...rcoal Basket creating a more even heat distribution throughout the Barrel Body Next place the Cooking Grids into the Barrel Body resting each grid on the pre mounted support brackets Adjust the height...

Отзывы: