
ENGLISH
12
11. ATTACHING THE CYLINDER WIRE RETAINER
Parts Required:
1 x LP Gas Cylinder Wire Retainer
(#15)
Installation:
• Mount the LP Gas Cylinder Wire Retainer between the Front-Right Leg and
Back-Right Leg
12. ATTACHING THE ASH TRAY BRACKET
Parts Required:
1 x Ash Tray Bracket
(#28)
3 x Screw
(#B)
Installation:
• Mount the Ash Tray Bracket to the bottom of the Main Barrel / Hopper
Assembly.
Use: 3 pcs M5 x 12 screws.
13. SECURING THE ASH TRAY BRACKET
Parts Required:
1 x Ash Tray Bracket
(#28)
2 x Screw
(#B)
Installation:
• Tighten the Ash Tray Bracket to the Cart Front Panel.
Use: 2 pcs M5 x 12 screws.
14. INSTALLING THE ASH CLEANING PULL HANDLE ASSEMBLY
Parts Required:
1 x Ash Cleaning Pull Handle Assembly
(#27)
Installation:
• Insert the Ash Cleaning Pull Handle Assembly to the hole on the Ash Tray
Bracket and tighten the handle with the bottom of Main Barrel / Hopper
Assembly.
15. INSTALLING THE ASH TRAY
Parts Required:
1 x Ash Tray
(#29)
Installation:
• Insert the Ash Tray to the Ash Tray bracket.
11
15
12
28
13
15
29
14
27
INSIDE VIEW