Installation
I
nstructions
10
(1)
Electric
al
B
ox
C
over
R
emoval
Unscrew the mounting screws to remove the electric box cover.
(2)
Fasten the power supply cable and the transmitting cable to the conduit holder using the lock
nut.
(3)
Connect the power supply cable and the transmitting cable to
the
terminal.
(4)
Fasten the power supply cable and the connection cable
using
the cable clamp.
(5)
Be sure to seal
all
holes when applying the putty.
Arrange
the cables side
-by-
side
, flat
. (Do not overlap the cables.)
(6)
Put the electric box cover back after completion of the work.
Lock Nut
(field-supplied)
Conduit Plate
Conduit Connector
(field-supplied)
Power Supply
Transmitting Cable
(to wired controller)
(1) Remove the screws, maintenance plate, and the valve cover.
(2) Pass transmitting cable and power supply through the two holes on the right side plate.
(3) Fasten the conduit connection to the right side plate using the lock nut.
(4) Connect the transmitting cable and power supply to the terminal.
(5) Secure the transmitting cable and power supply together with the clamp tightly.
(6) After completion of the wiring, seal the wiring hole with the putty.
(7) Put the maintenance plate and the valve cover back after completion of the work.
48K/
60K
BTU
Wir
ing
steps:
24K/36K
BTU
Maintenance Plate
Valve Cover
Conduit Connector for Power Supply
Lock Nut(Qty:2)
Power Supply
Right Side Plate
Transmitting Cable
Conduit Connector for
Transmitting Cable
Maintenance
Plate
Valve Cover
Right Side Plate
Hole
Conduit Connector
Lock Nut
Содержание YH1824GHFD18RT2
Страница 2: ...This page intentionally left blank ...
Страница 15: ...This page intentionally left blank ...