80
X-MDX717, XR-MDX717
Drawer
Chassis
10mm is opened
1
1
This part of Drawer is put on Chassis like the arrow.
The following work is done before Drawer is put on Chassis.
(1) It is confirmed that Carriage 300 is clamped, and Clamper has
fallen.
(2) It is confirmed to Drawer to be built in neatly in order of Carriage
200 and 100.
(3) Arm Stopper B is moved horizontally (inside) as shown in the
figure below.
(4) Pulls Slider 2 until the lock comes off to the direction of ta front
side.
7
ASSSEMBLY OF DRAWER AND CHASSIS
A
A
B
B
Coming off of
a black gear
is noted.
Coming off
in the spring
is noted.
The lock
comes off.
Slider 2
Direction of front
Arm
Stopper
B
Note : Do not lift Arm Stopper B for above when you move Arm
Stopper B.
There is a possibility to bend the spring when Arm Stopper B
is lifted, and the spring bends. And, when Arm Stopper B
becomes floatage feeling, Drawer is caught.
Pulley C
Bevel Gear1
6
6
Bevel Gear is done in the slide in the middle of Pulley C and
Carriage 300.
4
3
5
2
Bevel Gear1
Lac teeth
Gear Idler A (Black)
2
The lac teeth and Gear Idler A are matched, and it is pressed
under the diagonal lightly.
3
Right this side of Drawer is lifted.
4
Drawer is moved back and forth, and stops Drawer with the
point which it enters left.
5
Its right side is slowly lowered up to the angle by which Bevel
Gear can do in the slide while doing Drawer back and forth by
about 5mm.