background image

 

- 8 - 

floor

floor

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

    Once the height is determined, use the bubble level to insure that the bracket is level. Next, using a pencil, mark the six (6) lag bolt slot openings on the mounting bracket. Before 
continuing, confirm the marks are located on the center of the studs. Drill 1/4" pilot holes on the six (6) markings on the wall. Raise the tilt back plate and have someone hold it in place 
(arrow side away from the wall and pointing up).  Put the lag bolt through the flat washers. Screw the lag bolt through the upper left slot opening into the 1/4" pilot hole.  Confirm that 
the wall mount is still leveled and then screw a lag bolt to the upper right side slot opening into the 1/4" pilot hole.  Then install the remaining four lag bolts tightly into the wall studs in 
the lower left and right slot openings on the wall mount. 
Make any lateral positioning if any then secure the lag bolts.

 

See fig 4.

 

 

 

Wood studs behind 

the wall structure 

Drill gun with a 1/4" 

drill bit 

Wall structure 

Marking on wall 

Flat washers 

5/16" Lag bolts 

Access holes 

Tilt back plate 

Electrical  

Step 4 
All electrical wiring components should be installed at this time to ensure that the plasma display has enough power sources. 

Note: Pre drill before the securing the 

5/16" lag bolts. 

Caution: Do not over tighten the 5/16" lag bolts 

Center of 

viewing marks 

Содержание PWM-6121

Страница 1: ...PLASMA DISPLAY MOUNT MODEL INSTALLATION MANUAL For service and parts contact Premier Mounts 3130 E Miraloma Ave Anaheim CA USA 92806 Phone 800 368 9700 Fax 800 832 4888 Visit us at www mounts com ...

Страница 2: ... 2 o Safety precautions o Mount diagrams o Parts List o Installing the mounting bracket o Installing the mount o Electrical o Securing the mounts o Additional security Contents ...

Страница 3: ... precaution measures must be practiced at all times during the installation of this product Use proper safety gear and tools for the installations procedure to prevent personal injury or damage to the plasma displays or plasma mounts A secured structure wooden stud wall must always support the weight or load of the plasma Always confirm the center of the wood stud before beginning the installation...

Страница 4: ...CK PLATE MOUNTING BRACKET PART PSB TBP MATERIAL 12 GA CRS COLOR Black powder coat A Lag bolt access slot B Mounting points 4 5 used on installations other than wall mounting C Access hole for power or cables D Mounting points for additional security screws PART Mounting bracket MATERIAL 12 GA P O COLOR Black Powder coat Mount Diagrams ...

Страница 5: ...RIPTION 6 5 16 Dia Lag bolts 1 Mounting bracket 1 PSB TBP tilt back plate 2 M6 x 12 mm Phillip security screws Used for additional security on tilt mounts mobile carts floor stands and ceiling mounts 1 Installations instructions 6 M8 x 20 Phillip screws Mount hardware Parts List TOOLS NEEDED HARDWARE LIST PSA 1 Height adjustable ceiling adapter PCA 1 Ceiling adapter ...

Страница 6: ... the back of the plasma display align the mounting holes from the mounting bracket to the holes on the plasma display Arrow found on the mount must always be pointing to the top of the plasma display before securing it to the plasma display Loosely install the six 6 M8 x 20 Phillip screws to the plasma then secure the screws with a Phillips screwdriver CAUTION Do not over tighten the M8 x 20 Phill...

Страница 7: ...ct Please verify that your plasma mounting points from the back of the chassis are centered before installing the back plate if not take proper measurements for your installation requirements Select the area where the plasma will be installed and make sure it can support the weight standards see warning on page 3 Locate the 16 wood stud centers behind the wall using a commercially available stud f...

Страница 8: ... that the wall mount is still leveled and then screw a lag bolt to the upper right side slot opening into the 1 4 pilot hole Then install the remaining four lag bolts tightly into the wall studs in the lower left and right slot openings on the wall mount Make any lateral positioning if any then secure the lag bolts See fig 4 Wood studs behind the wall structure Drill gun with a 1 4 drill bit Wall ...

Страница 9: ...play Mounting bracket Tilt back plate 4 Tab openings Wall structure Plasma display Wall structure Align all four 4 tab openings to the tilt back plate receiving tabs and push the plasma as shown on arrows to lock in place Caution The plasma display is heavy and 2 people are needed to lift and install it Failure to do so could result in serious personal injury Caution All four 4 receiving tab openi...

Отзывы: