DV-696AV-S
68
1
2
3
4
1
2
3
4
C
D
F
A
B
E
Holder Traverse
Insulator (F)
Traverse Ass'y
Insulator (F)
Insulator (R)
NOTE
1. In case of the Clamper Ass'y installation, install
correctly as Fig. 2-5-B.
Fig. 2-5-B
Plate Clamper
Clamper
2-6:
Remove the Holder Traverse.
Remove the 2 Insulator (F).
Remove the Insulator (R).
1.
2.
3.
Fig. 2-6-A
HOLDER TRAVERSE/INSULATOR (F)/INSULATOR
(R) (Refer to Fig. 2-6-A)
NOTE
1. In case of the Insulator (F) installation, install correctly
as Fig. 2-6-B.
Fig. 2-6-B
Traverse Holder
Insulator (F)
2-7:
Unlock the support
1
.
Remove the Gear Middle.
Remove the screw
2
.
Remove the Rack Feed Ass'y.
Remove the screw
3
.
Remove the Switch PCB Ass'y.
Remove the screw
4
.
Remove the Gear Feed.
Remove the 2 screws
5
.
Remove the Feed Motor.
Remove the Gear Motor.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
SWITCH PCB ASS'Y/GEAR MIDDLE/GEAR FEED/RACK
FEED ASS'Y/FEED MOTOR (Refer to Fig. 2-7-A)
3
Gear Middle
Gear Motor
Feed Motor
• Screw Torque: 1.3
±
0.3 kgf • cm (Screw
2
)
• Screw Torque: 3.0
±
0.3 kgf • cm (Screw
3
)
• Screw Torque: 1.0
±
0.3 kgf • cm (Screw
4
,
5
)
Switch PCB Ass'y
2
4
Rack Feed Ass'y
Gear Feed
5
Fig. 2-7-A
Traverse Ass'y
5
1
NOTE
1.
2.
3.
4.
When installing the Rack Feed Ass'y, push both ends to
align the teeth as shown Fig. 2-7-B. Then install it.
In case of the Gear Motor installation, check if the value
of the Fig. 2-7-C is correct.
When installing the wire of the Switch PCB Ass'y, install
it correctly as Fig. 2-7-D.
Manual soldering conditions
• Soldering temperature: 320
±
5 ˚C
• Soldering time: Within 4 seconds
• Soldering combination: Sn-3.0Ag-0.5Cu
After the assembly of the Traverse Ass'y, hook the wire
on the Traverse Ass'y as shown Fig. 2-7-E.
[OK]
[NG]
Fig. 2-7-B
Rack Feed Ass'y
Push
Push
Fig. 2-7-C
8.0
±
0.2 mm
Safety surface for pressing
of the insert.
Feed Motor
Gear Motor
Check Lock
Pickup leneses
GEM1004
GED-008
Содержание DV-696AV-K
Страница 40: ...DV 696AV S 40 1 2 3 4 1 2 3 4 C D F A B E ...
Страница 81: ...DV 696AV S 81 5 6 7 8 5 6 7 8 C D F A B E ...