DV-588A-S
65
5
7
8
5
6
7
8
C
D
F
A
B
E
BROWN (1)
WHITE (2)
NOTE
1.
2.
3.
4.
In case of the Pulley Motor installation, check if the value
of the Fig. 2-3-B is correct.
When installing the wire of the Loading Motor PCB Ass'y,
install it correctly as Fig. 2-3-C.
Manual soldering conditions
• Soldering temperature: 350
±
5˚C
• Soldering time: Within 4 seconds
• Soldering combination: Sn-3.0Ag-0.5Cu
When installing the Loading Motor PCB Ass'y, install it
correctly as Fig. 2-3-D.
In case of the Loading Motor PCB Ass'y installation, hook
the wire on the Loader Sub Ass'y as shown Fig. 2-3-E.
Fig. 2-3-B
7.0
±
0.1mm
Safety surface for pressing
of the insert.
Loading Motor
Pulley Motor
Check Hook
Loading Motor PCB Ass’y
Loading Motor PCB Ass’y
Fig. 2-3-C
Fig. 2-3-E
Fig. 2-3-D
Rack Loading
B
The Lever should be position
between A and B.
Check Hook
Rack Loading
2
Loader Sub Ass’y
Gear Main
2-4: RACK LOADING/MAIN GEAR/PULLEY GEAR
(Refer to Fig. 2-4-A)
1.
2.
3.
Unlock the support
1
and remove the Gear Pulley.
Remove the Gear Main.
Press down the catcher
2
and slide the Rack Loading.
Gear Pulley
1
Fig. 2-4-A
NOTE
1.
2.
In case of the Rack Loading installation, hook the Rack
Loading on the Loader Sub Ass'y as shown Fig. 2-4-B.
When installing the Gear Main, take care the direction
of up or down as shown Fig. 2-4-C.
Fig. 2-4-B
Rack Loading
Check Hook
Fig. 2-4-C
Main Gear
Up Side
Down Side
2-5: CLAMPER ASS'Y (Refer to Fig. 2-5-A)
Press the Clamper and rotate the Plate Clamper clockwise,
then unlock the 3 supports
1
.
Remove the Plate Clamper, Magnet Clamper and Clamper.
1.
2.
Plate Clamper
Magnet Clamper
Fig. 2-5-A
Main Frame
Clamper
1
1
1
Loader Sub Ass'y (Bottom Side)
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299