DV-400V-S
36
1
2
4
1
2
3
4
C
D
F
A
B
E
BROWN (1)
WHITE (2)
NOTE
1. In case of the Pulley Motor installation, check if the value
2. When installing the wire of the Loading Motor PCB Ass'y,
3. When installing the Loading Motor PCB Ass'y, install it
4. In case of the Loading Motor PCB Ass'y installation, hook
of the Fig. 2-3-B is correct.
install it correctly as Fig. 2-3-C.
Manual soldering conditions
• Soldering temperature: 320
±
20˚C
• Soldering time: Within 3 seconds
• Soldering combination: Sn-3.0Ag-0.5Cu
correctly as Fig. 2-3-D.
the wire on the Loader Sub Ass'y as shown Fig. 2-3-E.
Fig. 2-3-B
7.0
±
0.1mm
Safety surface for pressing
of the insert.
Loading Motor
Pulley Motor
Check Hook
Loading Motor PCB Ass’y
Loading Motor PCB Ass’y
Fig. 2-3-C
Fig. 2-3-E
Fig. 2-3-D
Rack Loading
The Lever should be position
between A and B.
Rack Loading
1
Loader Sub Ass’y
Gear Main
2-4: RACK LOADING/MAIN GEAR/PULLEY GEAR
(Refer to Fig. 2-4-A)
1. Unlock the support
2
and remove the Gear Pulley.
2. Remove the Gear Main.
3. Press down the catcher
1
and slide the Rack Loading.
Gear Pulley
2
Fig. 2-4-A
NOTE
1. In case of the Rack Loading installation, hook the Rack
2. When installing the Gear Main, take care the direction of
Loading on the Loader Sub Ass'y as shown Fig. 2-4-B.
up or down as shown Fig. 2-4-C.
Fig. 2-4-B
Rack Loading
Check Hook
Fig. 2-4-C
Main Gear
Up Side
Down Side
2-5: CLAMPER ASS'Y (Refer to Fig. 2-5-A)
clockwise, then unlock the 3 supports
1
.
1. Press the Clamper and rotate the Plate Clamper
2. Remove the Plate Clamper, Magnet Clamper and
Clamper.
Plate Clamper
Magnet Clamper
Fig. 2-5-A
Main Frame
Clamper
1
1
1
Loader Sub Ass'y (Bottom Side)
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299