CX-3168
37
5
6
7
8
5
6
7
8
C
D
F
A
B
E
1
Manually slide the stair (clockwise) to raise the stage block to the uppermost floor.
2
Remove front right spring A.
3
Change the position of the back left spring B from the home position to a temporary position. (The hook at
the temporary position is fixed on the stage. This means that the stage needs to be raised to the
uppermost floor to enable easy re-positioning of the spring.)
Home position
Temporary position
Spring B
Spring A
In a stair, 3 of F (front), L (left) and R (right) are linked by an arm at the bottom
of mechanics, and when moving it to <- direction, a stage moves to the top.
(clockwise when looking from upward)
Arm
Front
F
R
L