
7
REV-11 19, 12
Main Supply Connection
Connect the faucet shank to inlet supply lines (Q). Connect the supply
•
stops (R) to the inlet supply lines (Q) (left is hot water supply and right
is cold water supply). Make sure inlet supply lines (Q) are securely
tighten. Do not over tighten.
Turn on water. Check for any leaks. Make sure all the connections are
•
secure.
Remove aerator (S).
•
Open the handle.
•
Flush and allow water to run at full flow for at least one minute.
•
Replace aerator (S).
•
For more care information or trouble shooting inquiries about your
Pioneer Product, please see the contact information on the back page.
Содержание 3LG110 Series
Страница 5: ...5 REV 11 19 12 Pop up Drain Installation ...