Piney Optimizer 250 Скачать руководство пользователя страница 7

 

 

 
STARTING-UP 

 

Before starting-up observe the SAFETY WARNINGS contained in this Manual. 

 

Make sure the Outdoor Water Furnace, circulating loops and existing heat exchangers or 

baseboard heaters are full of water and properly vented. 

 

Ensure the circulating pump(s) is properly installed according to manufacturer’s instructions. 
Failure to do so could void the Warranty. 

 

Load the outdoor water furnace with wood only to fill half of the firepot. Use kindling wood to 
start the fire. DO NOT USE ANY FLAMMABLE LIQUIDS TO START THE FIRE. 

 

Always turn the power off before loading the appliance with wood or opening the firing door. 

Keep firing and gasification chamber doors tightly closed at all times for safety when outdoor 
water furnace is in use. Always open doors slowly.  

 

Inspect the chimney and make sure it is clear from any obstructions. 

 

Set the aquastat to the highest temperature setting on the dial (180  F) as described under 
SETTING. When the water temperature reaches this set point, the control will turn the 

combustion fan off to close the air damper in the back of the outdoor water furnace.  

 

When the combustion fan is shut off turn the setting dial down to a range of 160   to 180  F. 

Now turn the circulating pump(s) on and leave it on at all times. 
 

 

Before leaving the Outdoor Water Furnace location, make sure that: 

1.

 

The water level is adequate. 

2.

 

The wood loading door is tightly closed. 

3.

 

All doors are tightly closed. 

4.

 

The area around the outdoor water furnace is clear from any combustible materials. 

 

SETTING 

The Portage & Main Outdoor Water Furnace is equipped with a digital display immersion type 
aquastat controller which operates in response to water temperature changes. 
 

To set the temperature at the desired level, go to page 19 of this manual. 
 
 
 

 
 
 

 
 
 

 
 
 
 

 
 
 

 
 

Содержание Optimizer 250

Страница 1: ...1 PORTAGE MAIN OUTDOOR WATER FURNACE Optimizer 250 Wood Gasification Unit Installation and Operation Manual Please save these instructions and refer to them for safe and efficient performance...

Страница 2: ...ectrical Connections 6 Start Up 7 Setting 7 Operation Instructions 8 Saving Tips 8 Corrosion Control 9 Creosote Control 9 Ash Disposal 9 Safety Warnings 9 Maintenance Fan Damper Assembly 9 10 Connecti...

Страница 3: ...the full benefits of heating your home other buildings and your domestic water in a safe and efficient way We also recommend that you consult and comply with your local electrical plumbing and fire co...

Страница 4: ...ng heating systems as described later on You can also add a water to water heat exchanger to your system to provide you with all your domestic hot water requirements to increase your fuel savings cons...

Страница 5: ...ances to combustible materials are Back Sides Forty eight 48 inches 122 cm Front Sides Forty eight 48 inches 122 cm Top Eighteen 18 inches 46 cm Flue Pipe Eighteen 18 inches 46 cm Note Adequate space...

Страница 6: ...water in the heating loop s Ensure water trap and discharge pipe are properly installed and unobstructed to release any pressure build up in the outdoor water furnace CORROSION CONTROL To control cor...

Страница 7: ...he chimney and make sure it is clear from any obstructions Set the aquastat to the highest temperature setting on the dial 180 F as described under SETTING When the water temperature reaches this set...

Страница 8: ...chamber at max burn you should see a very intense flame like a blow torch exiting the fire pot For this process to work efficiently the wood has to be dry and of smaller diameter 3 to 4 inches Experie...

Страница 9: ...fires We recommend inspecting the chimney once a month during the heating season and removal of creosote linings to reduce chimney fire hazards Green or unseasoned wet wood or wood that is not covered...

Страница 10: ...vance of the instructions contained in this Manual would assist you in maintaining the outdoor water furnace in good and safe working conditions ALWAYS SHUT OFF THE POWER SUPPLY prior to performing an...

Страница 11: ...M A water to water heat exchanger will be required to replace your existing boiler and provide you with all the comfort you require Your existing boiler would be used as a back up when required Refer...

Страница 12: ...12...

Страница 13: ...13...

Страница 14: ...14...

Страница 15: ...15...

Страница 16: ...16 Ground Ground Line 1 Nuetral 160 Green Switch Fan Black Actuater Toggle switch on front off Boiler Wiring Diagram...

Страница 17: ...re Operation SF establishes how the A419 control s output relay operates the equipment in the event of a sensor or sensor wiring failure The user may select to run the equipment continuously or to shu...

Страница 18: ...operation use the following method 1 Press and hold Menu until the display changes to flashing SP This takes about 2 seconds 2 Press Up or Down arrows repeatedly until the desired function is display...

Страница 19: ...4 to 100 C 30 DIF Differential 1 to 30 F or C in 1 degree increments 5 ASD Anti short cycle Delay 0 to 12 in 1 minute increments 1 OFS Temperature Offset 0 to 50 F or C in 1 degree increments 0 SF Sen...

Страница 20: ...ouse malfunction Ash door not shut tight Clean lube and re install Clean metal to metal surface Check Aquastat Check Thermostat Check gasket on ash door Water Boiling Fan running constantly Aquastat m...

Страница 21: ...er value at any time Piney Manufacturing Ltd reserves the right to replace or repair the parts at its sole discretion In addition to the warranty above the Piney Manufacturing Ltd warranty does not co...

Страница 22: ..._____________________________________ Address ________________________________________________________________ Dealer s Signature ________________________________________________________ Date ________...

Страница 23: ...23 Records Notes...

Страница 24: ...24...

Отзывы: