Commissioning
Operating Manual PNOZ mc7p
1003050EN02
14
6.3
Download modified project to the PNOZmulti safety system
As soon as an additional expansion module has been connected to the system, the project
must be amended using the PNOZmulti Configurator. Proceed as described in the operat
ing instructions for the base unit.
NOTICE
For the commissioning and after every program change, you must check
whether the safety devices are functioning correctly.
6.4
Connection example
CC-Link
Master
CC-Link
Slave 1
CC-Link
Slave 2
CC-Link
Slave 3
CC-Link
Slave n
PNOZ mc7p CC-Link
PNOZ mc7p
x1
x10
X1
BAUD
RATE
1
2
3
4
5
SD
RUN
L
ERR.
RD
1
CC-Link