![Pilz 506 220 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/pilz/506-220/506-220_operating-manual_1556936012.webp)
PSEN ma1.3a/b-20
Operating Manual PSEN ma1.3a/b-20
21705-EN-11
| 12
}
PNOZ X for safety gate monitoring
– PNOZ X2, PNOZ X2.5P, PNOZ X2.7P, PNOZ X2.8P, PNOZ X2.9P, PNOZ X2C
– PNOZ X3, PNOZ X3.1, PNOZ X3P, PNOZ X3.10P
– PNOZ X4
– PNOZ X5, PNOZ X5J
– PNOZ Ex
}
PNOZmulti for safety gate monitoring
Configure the switch in the PNOZmulti Configurator with switch type 3.
}
PSS for safety gate monitoring with standard function block SB064, SB066 or
FS_Safety Gate
}
PSSuniversal PLC for safety gate monitoring with function block FS_SafetyGate
The correct connection to the respective evaluation device is described in the operating
manual for the evaluation device. Make sure that the connection is made in accordance
with the specifications in the operating manual for the selected evaluation device.
Defined properties of evaluation devices:
}
2-channel with feasibility monitoring
}
Open circuit monitoring of the safety switch is performed
}
Inputs and outputs on the evaluation device must fulfil the requirements of IEC 61131,
Type 3
}
Technical data of the evaluation device must fulfil the requirements in the
of PSEN ma1.3a/b-20
– Always comply with the max. switching current safety contacts of PSEN ma1.3a/b-20.
}
Outputs at the evaluation device must only be switched on again when both reed con-
tacts at the safety switch have been opened and closed (partial operation lock)
INFORMATION
Risk time in accordance with DIN EN 60947-5-3
The risk time is made up of the reaction time of the sensor (see
) and the processing and delay times of the evaluation
device (s. operating manual for the relevant evaluation device).