JOB SET UP / CLOSE UP
GENERAL MAINTENANCE PROCEDURE
Table of Contents
Page
JOB SET UP / CLOSE UP - GENERAL MAINTENANCE PROCEDURE..................................
Index of Tables
Page
1
2
3
4
5
6
7
8
References
Table 1 References
Data module/Technical publication
Title
12-B-05-20-00-00A-018A-A
SCHEDULED MAINTENANCE CHECK LISTS - INTRODUC-
TION
12-B-06-20-00-00A-040A-A
ACCESS PROVISION - DESCRIPTION
12-B-07-10-00-00A-901A-A
JACKING - MAINTENANCE PRACTICES
12-B-12-20-01-00A-902A-A
AIRCRAFT EXTERIOR WASHING - SERVICING
12-B-12-20-02-00A-902A-A
AIRCRAFT WINDOWS CLEANING - SERVICING
12-B-12-20-03-00A-902A-A
AIRCRAFT INTERIOR CLEANING - SERVICING
12-B-25-10-01-00A-920A-A
FLIGHT COMPARTMENT CREW SEATS - REMOVAL/IN-
STALLATION
12-B-25-21-01-00A-920A-A
EXECUTIVE SEATS - REMOVAL INSTALLATION
12-B-25-22-01-00A-920A-A
STANDARD SEATS - REMOVAL/INSTALLATION
12-B-71-00-00-00A-903A-A
POWER PLANT - ADJUSTMENT/TEST
Required Conditions
Table 2 Required Conditions
Action / Condition
Data module/Technical publication
None
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 26 MSN 545, 1001-1719,
1721-1999
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-05-20-00-00A-913A-A
UNCLASSIFIED
2021-12-04 Page 1