44
HBC 975
EN
Use, maintenance and warning manual
SLAM-SHUT VALVE
|
TRANSPORT AND HANDLING
|
REV. 00
5.4 - PACKAGING REMOVAL
Packaging removal
Operator qualification
• Person in charge of transport, handling, unloading and placing on site;
• Installer.
PPE required
WARNING!
The PPE listed in this table is related to the risk associated with the equipment.
For the PPE necessary to protect against risks associated with the workplace or
operating conditions, please refer to:
•
the regulations in force in the country of installation;
•
any information provided by the Safety Manager at the installation facility.
Tab. 5.26.
To unpack the equipment, proceed as follows:
Step Action
Image
1
Remove the straps (A).
B
A
A
A
2
Remove the packaging cardboard (B).
3
Remove the fasteners that secure the equipment to the base (if
any).
4
Move the equipment from the base to the place intended for it.
NOTE!
Have at least 2 operators manually move the equipment,
if required due to its dimensions/weight.
Tab. 5.27.
NOTE!
After removing all packaging materials, check for any anomalies.
If there are anomalies:
•
do not install the equipment;
•
contact PIETRO FIORENTINI S.p.A. and specify the details provided on the equipment nameplate.
5.4.1 - PACKAGING DISPOSAL
NOTE!
Sort the various materials making up the packaging and dispose of them in compliance with the regula
-
tions in force in the country of installation.
Содержание HBC 975
Страница 1: ...HBC 975 EN Revision 00 Edition 09 2021 Slam shut valve USE MAINTENANCE AND WARNING MANUAL ...
Страница 2: ...2 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE INTRODUCTION REV 00 ...
Страница 4: ...4 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE INTRODUCTION REV 00 ...
Страница 10: ...10 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE INTRODUCTION REV 00 ...
Страница 18: ...18 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE GENERAL INFORMATION REV 00 ...
Страница 33: ...33 HBC 975 Use maintenance and warning manual SLAM SHUT VALVE DESCRIPTION AND OPERATION REV 00 EN ...
Страница 36: ...36 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE DESCRIPTION AND OPERATION REV 00 ...
Страница 46: ...46 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE TRANSPORT AND HANDLING REV 00 ...
Страница 63: ...63 HBC 975 Use maintenance and warning manual SLAM SHUT VALVE COMMISSIONING REV 00 EN ...
Страница 70: ...70 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE COMMISSIONING REV 00 ...
Страница 85: ...85 HBC 975 Use maintenance and warning manual SLAM SHUT VALVE MAINTENANCE AND FUNCTIONAL CHECKS REV 00 EN ...
Страница 88: ...88 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE MAINTENANCE AND FUNCTIONAL CHECKS REV 00 ...
Страница 142: ...142 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE MAINTENANCE AND FUNCTIONAL CHECKS REV 00 ...
Страница 148: ...148 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVES TROUBLESHOOTING REV 00 ...
Страница 152: ...152 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE RECOMMENDED SPARE PARTS REV 00 ...
Страница 156: ......