TSMS-5/16RK
7
Rev. 04/05
Ph: 800-421-6511
www.picomacom.com
Installation Procedure
Installation
It is recommended that assistance be available to safely install equipment in equipment racks.
1.
Install chassis in equipment rack (equipment rack sold separately) by supporting the bottom and rear of
TSMS-5/16RK
at the
desired elevation in rack.
2.
Line up the side holes of chassis with the tapped equipment rack holes.
3.
Insert the provided screws through the mounting holes at the extreme left and right of faceplate and thread into the tapped
equipment rack holes.
4.
Fasten the bottom screws first, then fasten top screws (tighten securely).
5.
Connect a cable from the
RHCP
port of a
LNB
to the
LNB RHCP (14V)
port of the
TSMS-5/16RK
.
6.
Connect a cable from the
LHCP
port of a
LNB
to the
LNB LHCP (18V)
port of the
TSMS-5/16RK
.
7.
Connect a cable from the
RHCP
port of a
LNB
to the
LNB RHCP (14V, 22KHz)
port of the
TSMS-5/16RK
.
8.
Connect a cable from the
LHCP
port of a
LNB
to the
LNB LHCP (18V, 22KHz)
port of the
TSMS-5/16RK
.
9.
If employing an off-air antenna, connect the antenna cable to the
ANT IN
port of the
TSMS-5/16RK
.
10.
Connect a receiver input directly to the
OUT
port of the unit if not using an off-air antenna.
11.
If using an off-air antenna connect the
ANT/SAT
of a
TSDM-2150
diplexer to the
OUT
port of the switch. Connect a satellite
receiver
SAT IN
to the
SAT
port and the satellite receiver
ANT IN
to the
ANT
. Port of the
TSDM-2150
.
12.
Plug the power cord into a 120Vac 60Hz wall receptacle.
TSMS516RK Manual.qxd 4/12/05 2:58 PM Page 7